RICHLAND COUNTY TRANSPORTATION
PENNY PROGRAM
Monthly Progress Report
January 2021
Polo Rd.
Roadway Paving
Greene St.
Rebar Installation
Greene St.
Bridge Installation
Page 2
January 2021
TABLE OF CONTENTS
PROGRAM OVERVIEW .............................................................................................................................................. 5
PROGRAM MANAGEMENT SUMMARY .............................................................................................................................................. 5
PROGRAM FINANCIAL SUMMARY ..................................................................................................................................................... 7
ATLAS ROAD WIDENING .................................................................................................................................................................... 8
272 BLUFF ROAD PHASE 2 IMPROVEMENT ........................................................................................................................................ 9
BLYTHEWOOD ROAD WIDENING (SYRUP MILL ROAD TO I-77) ......................................................................................................... 10
BLYTHEWOOD ROAD AREA IMPROVEMENTS .................................................................................................................................. 11
BROAD RIVER RD. WIDENING .......................................................................................................................................................... 12
CLEMSON RD. WIDENING ................................................................................................................................................................ 13
HARDSCRABBLE RD. WIDENING ...................................................................................................................................................... 14
LEESBURG RD. WIDENING ............................................................................................................................................................... 15
LOWER RICHLAND BLVD. WIDENING ............................................................................................................................................... 16
N. MAIN ST. WIDENING ................................................................................................................................................................... 17
PINEVIEW RD. WIDENING ................................................................................................................................................................ 18
POLO RD. WIDENING ....................................................................................................................................................................... 19
SHOP RD. WIDENING ....................................................................................................................................................................... 20
SPEARS CREEK CHURCH RD. WIDENING ........................................................................................................................................... 21
BULL ST. AND ELMWOOD AVE. INTERSECTION ................................................................................................................................ 22
CLEMSON RD. AND SPARKLEBERRY LN. INTERSECTION ................................................................................................................... 23
GARNERS FERRY RD. AND HARMON RD. INTERSECTION ................................................................................................................. 24
NORTH SPRINGS RD. AND HARRINGTON RD. INTERSECTION ........................................................................................................... 25
SCREAMING EAGLE RD. AND PERCIVAL RD. INTERSECTION ............................................................................................................. 26
SHOP RD. EXTENSION PHASE 2 ........................................................................................................................................................ 27
INNOVISTA – GREENE ST. PHASE 2 .................................................................................................................................................. 28
BROAD RIVER CORRIDOR NIP .......................................................................................................................................................... 29
CRANE CREEK NIP ............................................................................................................................................................................ 30
Page 3
MONTHLY PROGRESS REPORT
DECKER\WOODFIELD NIP ................................................................................................................................................................ 31
SERN NIP ......................................................................................................................................................................................... 32
TRENHOLM ACRES\NEWCASTLE NIP ................................................................................................................................................ 33
COLUMBIA MALL GREENWAY .......................................................................................................................................................... 34
CRANE CREEK GREENWAY ............................................................................................................................................................... 35
GILLS CREEK GREENWAY ................................................................................................................................................................. 36
POLO RD\WINDSOR LAKE GREENWAY ............................................................................................................................................ 37
SMITH\ROCKY BRANCH GREENWAY ................................................................................................................................................ 38
THREE RIVERS GREENWAY .............................................................................................................................................................. 39
ALPINE RD. SIDEWALK (TWO NOTCH RD TO PERCIVAL RD) .............................................................................................................. 40
HARRISON RD. SIDEWALK Package S12(TWO NOTCH RD TO FOREST DR) ....................................................................................... 41
PERCIVAL RD. SIDEWALK (FOREST DR TO DECKER BLVD) ................................................................................................................. 42
POLO RD. SIDEWALK Package S13 (MALLET HILL RD TO ALPINE RD) ................................................................................................ 43
SIDEWALK PACKAGE S-10 CLEMSON RD. PH. 1 SIDEWALK .............................................................................................................. 44
SIDEWALK PROGRAM ...................................................................................................................................................................... 45
SUNSET DR. SIDEWALK (ELMHURST RD TO RIVER DR) ..................................................................................................................... 47
BIKEWAY PROGRAM – ROAD DIETS ................................................................................................................................................. 48
BIKEWAY PROGRAM - RESTRIPING .................................................................................................................................................. 49
BIKEWAY PROGRAM – SHARED USE PATHS ..................................................................................................................................... 50
PEDESTRIAN IMPROVEMENT PROJECTS - Project 767 ...................................................................................................................... 51
DIRT ROAD PAVING PACKAGE “J” - Project 771 ............................................................................................................................... 52
DIRT ROAD PAVING PACKAGE “K” - Project 788 .............................................................................................................................. 53
DIRT ROAD PAVING PROJECTS YEARS 1 & 2 - Project 331 ................................................................................................................ 54
DIRT ROAD PAVING PROJECTS YEARS 3 & 4 - Project 417 ................................................................................................................ 55
RESURFACING PACKAGE “P” - Project 765 ....................................................................................................................................... 56
RESURFACING PACKAGE “Q” - Project 770 ...................................................................................................................................... 57
RESURFACING PACKAGE “R” - Project 783 ....................................................................................................................................... 58
COMPLETED PROJECTS .................................................................................................................................................................... 60
Page 4
January 2021
RIGHT-OF-WAY ACQUISITION SUMMARY ........................................................................................................................................ 75
UTILITY SUMMARY (active projects) ................................................................................................................................................ 96
CONSTRUCTION PROCUREMENT SUMMARY ................................................................................................................................. 105
Page 5
MONTHLY PROGRESS REPORT
PROGRAM OVERVIEW
MILESTONES
DATE
Referendum approving sales tax approved by voters
6-Nov-12
Transportation Penny Advisory Committee (TPAC) appointed by Council
9-Apr-13
Sales tax collections begin
1-May-13
Cooperative Intergovernmental Agreement (IGA) between County and SCDOT approved
7-Feb-14
Program Development Team Notice of Intent to Award issued
2-Jul-14
Richland Penny Office established
11-Aug-14
Project rankings approved by Council
7-Oct-14
Program Development Team full contract approved
3-Nov-14
2015 CTIP approved by County Council
9-Dec-14
Dirt road paving LNTP
23-Dec-14
"State of the Penny" for CY 2014 address by TPAC presented to public
26-Jan-15
Five On-Call Engineering Teams (OETs) under contract
2-Mar-15
Contract and service agreement process and procedure for OETs approved by Council
21-Apr-15
Richland Penny Program releases 2015 Annual Report
27-Jan-16
2016 CTIP approved by County Council
15-Mar-16
Richland County Council votes to transition program in-house
5-Mar-19
Program Development Team’s joint venture contract ends
3-Nov-19
Greenway Re-alignment Ordinance Passed by Council, 056-19HR
7-Jan-20
Penny Project De-scope Plan Approved by Council
5-May-2020
PROGRAM MANAGEMENT SUMMARY
Program Planning and Project Development:
On March 5, 2019, Richland County Council voted to permit staff to begin the implementation of its transition of the
Penny Program in-house. The Program Development Team’s Joint Venture contract ended Nov. 3, 2019. Effective Nov. 4,
2019, Richland County Transportation staff has assumed full management of the program. This includes individual
project management, Right-Of-Way (ROW), Utility Coordination and coordinating with stakeholders to ensure an
inclusive approach to the planning and development of Richland Penny projects. These stakeholders include community
leaders, other government entities, and special-interest groups and organizations. The team is currently coordinating on
active projects with the following: Central Midlands Transit (COMET), the River Alliance, the University of South Carolina,
the Gills Creek Watershed Association, the City of Columbia, Sustainable Midland, Town of Blythewood, and the South
Carolina Department of Transportation (SCDOT).
Pre-Construction:
Design continues on the following projects:
• Widenings: Blythewood Rd. Widening and Area Improvements, Atlas Rd., Polo Rd., Spears Creek Church Rd.
• Intersections: Bull\Elmwood
• Neighborhood Improvements: Crane Creek and Decker Boulevard/Woodfield Park
• Special: None
• Greenways: Gills Creek, Crane Creek, Rocky Branch
• Sidewalks: Alpine Road, Sunset Dr., Percival Rd.
• Dirt Roads: Year 1-2 roads and Year 3-4 roads are evaluated and moving into design
Right-of-Way:
 The Bull\Elmwood Intersection project requires one final ROW to be obtained before the project can begin.
 Blythewood Road Widening project requires four ROWs to be obtained.
Page 6
January 2021
 Review of Right of Way obtained for the Atlas Road Widening is underway to confirm remaining requirements.
 Sunset Dr. Sidewalk requires 3 permissions before design is finalized.
 Blythewood Rd. Area Improvements require several permissions before boring samples can be obtained to assist
with design.
Procurement:
 Bids were received for Resurfacing Package R, and the award will go Committee for approval on 2/23.
 Bids were received for Clemson Rd. Ph. 1 Sidewalk; however, the low bidder did not submit all required
paperwork along with their bid so the project could not be awarded to them. The second lowest bidder was
more than 10% higher than the low bidder so this solicitation was canceled. The project was re-advertised and
the award will go to Committee for approval on 2/23.
Construction:
Construction continues on the following projects:
1. Clemson Road Widening (final punchlist items)
2. Southeast Richland Neighborhood Improvements (SERN)
3. Three Rivers Greenway
4. North Main Street Widening
5. Hardscrabble Road Widening
6. Polo Rd. SUP
7. Harrison Rd. Sidewalk Project (final punchlist items)
8. Innovista – Greene St. Ph. II
9. North Springs/Harrington Intersection (final punchlist items)
10. Faraway Dr. Sidewalk (part of the Decker\Woodfield NIP)
11. Dirt Road Package K
Financial Management:
A bonding model was received from the County financial advisors in July 2019. Based on the data provided, the PDT
finalized the draft 2019 CTIP and quarterly financial cost estimates, cash flow plans and expenditure summaries and
submitted to the County in August 2019.
A partial payback bonding model was developed between County Staff and the County financial advisors in the Fall of
2019. The partial payback option was approved by County Council and a Bond Anticipation Note (BAN) was sold by the
County in the amount of $125,000,000 in February 2020. $55,250,000 of the BAN was used to pay back the previous
BAN and interest. The remaining money is available for program costs.
On December 8, 2020 Council approved to pay down $25M of the existing debt and to Bond for $100M, which will be
paid down over the next 7 years. The Bond will be issued in February 2021.
Page 7
MONTHLY PROGRESS REPORT
PROGRAM FINANCIAL SUMMARY
Transportation Monthly Reporting
January 2021
REVENUES
PREVIOUS PERIOD
Current Period
TO DATE
Federal Funds
$13,162,981.96
$0.00
$13,162,981.96
State Funds
$98,850.00
$0.00
$98,850.00
Sales Tax Collections
$462,749,157.50
$18,391,645.78
$481,140,803.26
Other Sources
$6,023,028.80
$0.00
$6,023,028.80
Interest earned
$3,959,857.64
$18,222.79
$3,978,080.43
Total Revenue
$485,993,875.88
$18,409,868.57
$504,403,744.45
EXPENSES
PREVIOUS PERIOD
CURRENT PERIOD
TO DATE
CMRTA (COMET)
$124,087,340.76
$0.00
$124,087,340.76
Mitigation Bank
$16,254,346.42
$0.00
$16,254,346.42
Bond Debt Service
$3,363,042.05
$0.00
$3,363,042.05
County Transportation
$4,669,896.86
$115,820.17
$4,785,717.03
County OSBO/SLBE
$990,992.97
$0.00
$990,992.97
PDT LNTP
$2,168,175.75
$0.00
$2,168,175.75
PDT Operations
$5,498,473.47
$0.00
$5,498,473.47
Dirt Road Paving Management
$3,784,959.96
$0.00
$3,784,959.96
Planning and Delivery
$23,897,007.53
$50,930.64
$23,947,938.17
Design
$51,584,576.89
$143,580.98
$51,728,157.87
Right-Of-Way
$10,149,797.02
$1,073.10
$10,150,870.12
Utilities
$22,219,554.85
$0.00
$22,219,554.85
Construction
$172,933,291.95
$2,912,963.69
$175,846,255.64
Total Expenses
$447,223,961.43
$3,224,368.58
$450,448,330.01
Page 8
January 2021
ATLAS ROAD WIDENING
Project 271 | Districts 10, 11
SCOPE
The revised descope recommends a widening Atlas Rd from 2 lanes to 5 lanes between Shop Rd. and Garners Ferry Rd. and
to include pedestrian improvements only between Bluff Rd. and Shop Rd.
SCDOT PIN: P029310
Project Length: 2.80 Mi
District: 10,11
PM: Jeff McNesby
Design: Cox & Dinkins, Inc.
SCHEDULE
ACTIVITY NAME
2015
2016
2017
2018
2019
2020
2021
2022
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS – Design is 85% complete. This project will be broken into two phases: phase 1 will be the
widening from Shop to Garners Ferry and phase 2 will be the pedestrian improvements between Bluff and Shop.
Activities since last period: HGB has received City approval for the water\sewer relocation plans and has submitted draft
easements to the City for review.
Activities for next period: Finalize Ph. 1 plans and prepare for advertisement.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$1,030,000.00
$996,726.79
Professional Srvs
$2,301,635.53
$1,173,322.96
Right of Way
$3,209,443.88
$1,920,617.00
Construction\RR\Util.
$30,104,362.60
$325,680.08
Page 9
MONTHLY PROGRESS REPORT
272 BLUFF ROAD PHASE 2 IMPROVEMENT
Project 272 | District 10
SCOPE
The proposed descope for this project includes installing a traffic signal at Bluff\Bluff Industrial, perform intersection
improvements as needed, and then resurface the road.
SCDOT PIN: P028861
Project Length: 2.00 Mi
District: 10
PM: Kim Toney
Design: Parrish & Partners, LLC
SCHEDULE
ACTIVITY NAME
2015
2016
2017
2018
2019
2020
2021
2022
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS
Activities since last period:
Activities for next period: Reach out to OET to finalize design
PHASE
*2029 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$192,573.71
$181,976.11
Professional Srvs
$2,098,652.45
$1,426,194.71
Right of Way
$518,760.00
$4,500.00
Construction
$1,302,926.29
$0
Page 10
January 2021
BLYTHEWOOD ROAD WIDENING (SYRUP MILL ROAD TO I-77)
Project 273 | District 2
SCOPE
The proposed scope recommends a 5-lane (4 travel lanes with a center turn lane) improvement from I-77 west to Syrup Mill
Road. Provisions for bicycle and pedestrian accommodation are proposed through construction of offset, shared-use paths.
This project also includes a double-lane roundabout at the intersection of Community Road and Cobblestone. Leftover funds
from Blythewood Area Improvements will be moved over to cover the shortage on this project once approved by County
Council.
SCDOT PIN: P030152
Project Length: 0.80 Mi
District: 02
PM: Mohammed Al-Tofan
Design: Parrish & Partners, LLC
SCHEDULE
ACTIVITY NAME
2017
2018
2019
2020
2021
2022
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS – Design is 98% complete and ROW Acquisition is 68% complete. Once ROW is finalized the
design can be finalized.
Activities since last period: Discussion is ongoing to coordinate a waterline conflict belonging to the Town of Winnsboro.
Activities for next period: Prepare a SO Modification adding bidding and construction phase services to the OET
Issues and resolutions: ROW is still needed from 4 parcels. This is currently being negotiated.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$316,630.32
$237,967.42
Professional Srvs
$969,419.36
$841,085.44
Right of Way
$1,128,490.39
$496,994.70
Construction
$10,793,587.37
$643,516.14
Page 11
MONTHLY PROGRESS REPORT
BLYTHEWOOD ROAD AREA IMPROVEMENTS
Project 274 | District 02
SCOPE
The proposed scope recommends roadway improvements in the Blythewood Road area specific to a prioritized listing as
provided by the Town of Blythewood.
 Priority #1- Widen and improve McNulty Street from Main Street to Blythewood Road;
 Priority #2- Widen, extend and improve Creech Road from Blythewood Road to Main Street;
 Priority #3- Widen and improve Blythewood Road from I-77 to Main Street;
 Priority #4- Widen and improve Blythewood Road from Syrup Mill to Fulmer Road.
SCDOT PIN: P038205
District: 02
PM: Mohammed Al-Tofan
Design: Parrish & Partners, LLC
SCHEDULE
ACTIVITY NAME
2019
2020
2021
Design
COST STATUS
PUBLIC STATUS – Creech Rd: Preliminary plans 95% and ROW plans 80%. McNulty St: Preliminary plans 100%, ROW plans
95%, construction plans 45%
Activities since last period: Boring samples for roadway design are still needed for Creech.
Activities for next period: OET to continue design. Geotech to obtain bores and complete soil analysis.
Issues and resolutions: Richland School District has not yet signed permission to obtain boring samples on their property,
stating that they did not know anything about this project.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$44,263.59
$72,616.40
Professional Srvs
$1,057,717.39
$320,547.15
Right of Way
$5,141,152.44
$0
Construction
$13,302,063.64
$0
Page 12
January 2021
BROAD RIVER RD. WIDENING
Project 275 | District 01
SCOPE
The proposed scope recommends a 5-lane section (4 travel lanes and a center turn lane) between Royal Tower Drive and
Dutch Fork Road. Bicycle and pedestrian accommodations shall include on-street bike lanes and sidewalks.
SCDOT PIN: P029344
Project Length: 2.50 Mi
District: 01
PM: Jeff McNesby
Design: CECS, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
Design
COST STATUS
PUBLIC STATUS
Based on Council’s approval, this project will be descoped to widen the road to 3 lanes (2 driving lanes and a median) and
also provide turning lanes at the intersections that are missing them at this time.
Activities since last period: Council approved descopes.
Activities for next period: Reach out to OET to finalize design
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$319,311.30
$207,898.50
Professional Srvs
$2,944,071.99
$1,428,147.26
Right of Way
$5,220,601.75
$0
Construction
$21,579,771.33
$0
Page 13
MONTHLY PROGRESS REPORT
CLEMSON RD. WIDENING
Project 276 | District 09,10
SCOPE
The proposed scope recommends a 5-lane section (4 travel lanes and a center turn lane) from Old Clemson Road to
Sparkleberry Crossing with shared-use paths for bicyclists and pedestrians between Old Clemson Road and Chimneyridge
Drive.
SCDOT PIN: P08858
Project Length: 1.90 Mi
District: 09, 10
PM: Kim Toney
Design: Holt Consulting Co., LLC
Construction: CR Jackson
SCHEDULE
ACTIVITY NAME
2016
2017
2018
2019
2020
2021
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS –Construction is complete.
Activities since last period: Contractor addressing punchlist items.
Activities for next period: Contractor to finalize punchlist items.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$587,138.26
$31,871.09
Professional Srvs
$1,451,209.84
$1,060,124.18
Right of Way
$598,055.00
$164,733.47
Construction
$11,037,271.88
$10,582,606.90
Page 14
January 2021
HARDSCRABBLE RD. WIDENING
Project 277 | District 02, 07, 08, 09
SCOPE
The proposed scope includes widening Hard Scrabble Road to four travel lanes and adding a center merge/turn lane. The
project will extend from Farrow Road to Kelly Mill Road. Sidewalks, bicycle lanes, and intersection improvements are
included. The Richland Penny Program is funding $29.86 million towards this $90 million construction contract.
SCDOT/COATS is funding the remaining costs. This project is being managed by the South Carolina Department of
Transportation (SCDOT) and the Richland Penny Program is providing limited CEI services.
Project Length: 7.20 Mi
District: 02, 07, 08, 09
PM: SCDOT
Construction: Palmetto Corp.
SCHEDULE
ACTIVITY NAME
2019
2020
2021
Construction
COST STATUS
PUBLIC STATUS
The South Carolina Department of Transportation (SCDOT) is managing this project and it is currently 50% complete. This
project is scheduled for completion in late 2022.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Construction
$29,860,000.00
$28,240,529.00
Page 15
MONTHLY PROGRESS REPORT
LEESBURG RD. WIDENING
Project 278 | District 10,11
SCOPE
This project is being managed by the South Carolina Department of Transportation (SCDOT). The proposed improvements
consist of widening Leesburg Road from a two-lane section to a five- lane section from Fairmont Road to Lower Richland
Boulevard and to include sidewalks along a portion of the project. The proposed project includes two travel lanes in each
direction, a two-way left turn lane, a bridge replacement over Mill Creek, intersection realignments, sidewalks, widened
outside lanes, and curb and gutters. The Richland Transportation Program is funding $4 million towards this estimated $49
million construction contract (per the current SCDOT STIP). SCDOT/COATS will fund all remaining costs.
Project Length: 3.70 Mi
District: 10, 11
PM: SCDOT
SCHEDULE
ACTIVITY NAME
2020
2021
2022
Construction
COST STATUS
PUBLIC STATUS
SCDOT anticipates letting the project in the summer of 2021.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Construction
$4,000,000.00
$0
Page 16
January 2021
LOWER RICHLAND BLVD. WIDENING
Project 279 | District 11
SCOPE
The proposed scope recommends a 5-lane section (4 travel lanes and a center turn lane) between Rabbit Run and
Garners Ferry Road and will include bicycle and pedestrian accommodations.
SCDOT PIN: P038202
Project Length: 0.60 Mi
District: 11
PM: Ali Eliadorani
Design: Mead & Hunt
SCHEDULE
ACTIVITY NAME
2020
2021
2022
Design
COST STATUS
PUBLIC STATUS
Based on Council’s approval, this project will be descoped to perform intersection improvements by installing dedicated
left-turn lanes at Garners Ferry and to install 5’ sidewalks on both sides of the road from Rabbit Run to Garners Ferry.
Activities since last period: Council approved descopes
Activities for next period: Reach out to OET to finalize design
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$47,713.61
$14,066.82
Professional Srvs
$1,122,239.83
$329,022.89
Right of Way
$291,860.00
$0
Construction
$3,538,186.56
$0
Page 17
MONTHLY PROGRESS REPORT
N. MAIN ST. WIDENING
Project 280 | District 04
SCOPE
The proposed scope recommends improving the existing deteriorating roadway surface by repaving, improving roadway
aesthetics by using imprinted and textured pavement stamping for designated crosswalks and landscape improvements
where appropriate, improving night safety with street lighting, and improving pedestrian routes and crosswalks. Other
proposed improvements include relocating overhead utilities to underground. In addition to $35.4M in funding from the
Richland Transportation Penny program ($5.4M from Intersections), this project is also being funded with a $16.7M Tiger
Grant, a $1.3M Federal Earmark and $5.8M from the City of Columbia for water and sewer work.
Project Length: 1.70 Mi
District: 04
PM: Kim Toney
Design: City of Columbia
Construction: L-J Construction, Inc.
SCHEDULE
ACTIVITY NAME
2019
2020
2021
Construction
COST STATUS
* Note: Additional funding for this project includes a $16.7M
Tiger Grant, a $1.3M Earmark, $5.8M from City of Columbia
for water and sewer work, and $5.4M from Richland Penny
Intersections.
PUBLIC STATUS - Overall the project is 95% complete.
Activities since last period: Curb & gutter, sidewalk construction, concrete median and landscaping underway for phases III
and IV.
Activities for next period: Finish street light installation, finish roadwork between Sunset and Monticello Ph. II & II, III, and
complete Ph. IV of project.
Issues and resolutions: Asphalt base exploration needed from Monticello Rd. to Fuller Ave.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$60,000.00
$34,153.78
Professional Srvs
$6,110,736.96
$55,056,835.80
Right of Way
$2,120,914.09
$1,854,704.14
Construction
$53,686,257.62
$50,457,118.45
Page 18
January 2021
PINEVIEW RD. WIDENING
Project 281 | District 10, 11
SCOPE
The proposed scope recommends a 3-lane (2 travel lanes with center turn lane) widened roadway from Bluff Road to Shop
Road and a 5-lane (4 travel lanes with a center turn lane) roadway from Shop Road to Garners Ferry Road. These
improvements will accommodate bicyclists through the use of 4 foot on-street bike lanes and provide for pedestrians
through the use of 5 foot sidewalks constructed behind the curb.
SCDOT PIN: P029306
Project Length: 2.90 Mi
District: 10, 11
PM: Rasheed Muwwakkil
Design: TBD
SCHEDULE
ACTIVITY NAME
2020
2021
2022
Design
COST STATUS
PUBLIC STATUS
Based on Council’s approval, the scope will be revised to only widen Pineview between Shop and Garners Ferry to a 3 lane
and to include bike\pedestrian improvements.
Activities since last period:
Activities for next period: Assign the project to an OET
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$221,741.76
$311,690.90
Professional Srvs
$2,187,333.23
$1,596,932.65
Right of Way
$954,220.50
$0
Construction
$4,636,704.51
$0
Page 19
MONTHLY PROGRESS REPORT
POLO RD. WIDENING
Project 282 | District 08, 09, 10
SCOPE
The proposed scope recommends a three-lane (two lanes with center turn lane) widened roadway from Two Notch Road to
Mallet Hill Road with bicycle and pedestrian accommodations. Based on Council’s approval, the scope will be revised to only
provide intersection improvements (turning lanes) at the locations of the four intersections (Polo Rd. with Two Notch Rd.,
Running Fox Rd., Miles Rd., and Mallet Hill Rd), and then include bikeways and 5’ sidewalks
SCDOT PIN: P038201
Project Length: 1.90 Mi
District: 08, 09, 10
PM: Allison Steele
Design: Cox & Dinkins, Inc.
SCHEDULE
ACTIVITY NAME
2020
2021
2022
Design
COST STATUS
PUBLIC STATUS – Data collection and surveying has begun.
Activities since last period: Surveying\data collection.
Activities for next period: OET to continue surveying\data collection.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$30,000.00
$126.32
Professional Srvs
$1,585,748.14
$382,286.80
Right of Way
$1,740,987.06
$0
Construction
$7,666,759.02
$0
Page 20
January 2021
SHOP RD. WIDENING
Project 283 | District 10
SCOPE
The proposed scope recommends a 5-lane (4 travel lanes with a center turn lane) widened roadway with offset, shared use
paths along both sides of the road (for bicycle and pedestrian accommodations) on Shop Road from George Rogers
Boulevard to Mauney Drive. Based on Council’s approval, the scope will be revised to widen the road to a 3-lane (2 travel
lanes and one median) and include the bike lanes and sidewalks.
SCDOT PIN: P028862
Project Length: 2.50 Mi
District: 10
PM: Ali Eliadorani
Design: Mead & Hunt
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS –
Activities since last period:
Activities for next period: Reach out to the OET to resume design according to the descope.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$336,048.45
$589,300.20
Professional Srvs
$2,670,089.57
$1,899,542.35
Right of Way
$6,689,668.88
$104,265.00
Construction
$22,050,941.35
$0
Page 21
MONTHLY PROGRESS REPORT
SPEARS CREEK CHURCH RD. WIDENING
Project 284 | District 09 10
SCOPE
The proposed descope is to widen the road to a 3-lane in order to provide a median from Two Notch Rd. to Jacobs Mill Pond
Rd.
SCDOT PIN: P038203
Project Length: 2.20 Mi
District: 09 10
PM: Allison Steele
Design: Holt Consulting, Inc.
SCHEDULE
ACTIVITY NAME
2020
2021
2022
Design
COST STATUS
PUBLIC STATUS
Activities since last period: OET has begun surveying\data collection.
Activities for next period: OET to continue surveying\data collection.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$71,541.37
$407.30
Professional Srvs
$2,424,509.39
$73,638.14
Right of Way
$3,375,000
$0
Construction
$19,555,500.00
$0
Page 22
January 2021
BULL ST. AND ELMWOOD AVE. INTERSECTION
Project 293 | District 04
SCOPE
The proposed scope recommends that Elmwood Avenue have an additional lane constructed on the south side of Elmwood
Avenue beginning at Marion Street and ending at the Bull Street intersection to provide eight lanes and a raised concrete
median. The existing southbound right- turn lane from Bull Street to Elmwood Avenue is proposed to be converted to a
channelized free flow movement. Bull Street is proposed to be restriped to add an additional northbound through lane and
remove the southbound dedicated right turn onto Calhoun Street. The leg of Elmwood Avenue that is used as the entrance
to the old Department of Mental Health Facility will retain the existing lane configurations.
SCDOT PIN: P032047
District: 04
PM: Rasheed Muwwakkil, Sr.
Design: CECS, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - The design for this project is complete.
Activities since last period: There is a possible water line conflict that needs to be addressed in the final construction plans.
The OET has been directed to investigate the issue which will require potholing the area to determine the depth of the
existing waterline. Finalize waterline investigation and obtain utility relocation approval.
Activities for next period: Finalize the ROW, and have the OET finalize the bid documents.
PHASE
*2020 Q4 ESTIMATE
EXPENDED TO DATE
Personnel
$76,060.75
$40,683.87
Professional Srvs
$395,486.81
$331,125.89
Right of Way
$185,885.00
$43,089.80
Construction
$3,141,378.46
$0
Page 23
MONTHLY PROGRESS REPORT
CLEMSON RD. AND SPARKLEBERRY LN. INTERSECTION
Project 295 | District 09, 10
SCOPE
The proposed scope recommends improvements to the Clemson Road and Sparkleberry Lane intersection to increase
intersection capacity. The project limits along Clemson Road begin at the Corporate Park Drive/Frontage Road Intersection
and end at Sparkleberry Crossing Road intersection and the limits along Sparkleberry Lane begin at Clemson
Road and end at Mallet Hill Drive.
SCDOT PIN: P029311
District: 09, 10
PM: Allison Steele
Design: Cox & Dinkins, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS
A value engineering study was performed and has received approval from SCDOT.
Activities since last period:
Activities for next period: Reach out to OET to begin design of this project.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$497,493.97
$544,653.84
Professional Srvs
$1,414,864.15
$627,631.84
Right of Way
$3,917,888.00
$3,229,910.40
Construction
$6,669,753.88
$0
Page 24
January 2021
GARNERS FERRY RD. AND HARMON RD. INTERSECTION
Project 297 | District 11
SCOPE
The proposed scope recommends that Garners Ferry Road be widened to provide a dedicated right turn lane onto Harmon
Road. It is also proposed to provide widening along Harmon Road to provide turn lanes. No modifications to Horrell Hill Road
are proposed with this project. A new traffic signal is to be installed with the proposed project.
SCDOT PIN: P030839
District: 11
PM: Mohammed Al-Tofan
Design: Cox & Dinkins, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS
Council has approved descope recommendations. This project was descoped to only perform a detailed traffic study at this
time. Based on Council’s approval, a traffic study will be performed in order to determine a suitable recommendation for
this intersection. The project has a 98% complete design; however, it does not address all the issues at the intersection.
Activities since last period: The OET has been made aware that the design doesn’t address all issues, and they have been
asked to discuss it with the firm that performed the traffic study to either perform a new traffic study or use the current
data to provide a more complete design. Staff met with the OET on 1/19 to discuss the project. It was determined that the
original scope is the best solution for the funds available.
Activities for next period: Present to Ad Hoc Committee on 2/23 to approve going back to original scope.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Page 25
MONTHLY PROGRESS REPORT
NORTH SPRINGS RD. AND HARRINGTON RD. INTERSECTION
Project 301 | District 08, 09
SCOPE
The proposed scope recommends that North Springs Road be widened to provide a left turn lane for both the northbound
and southbound directions while providing additional widening along Harrington Road to increase turning storage.
SCDOT PIN: P030841
District: 08, 09
PM: Jeff McNesby
Design: Cox & Dinkins, Inc.
Construction: Palmetto Corp. of Conway
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - Construction is now 100% complete.
Activities since last period: Punchlist items addressed by contractor
Activities for next period: Contractor to submit closeout documents
PHASE
*2020 Q4 ESTIMATE
EXPENDED TO DATE
Personnel
$120,000.00
$109,306.90
Professional Srvs
$171,138.08
$164,572.68
Right of Way
$48,348.00
$48,348.00
Construction
$939,038.00
$864,763.91
Page 26
January 2021
SCREAMING EAGLE RD. AND PERCIVAL RD. INTERSECTION
Project 303 | District 09, 10
SCOPE
The proposed scope recommends realigning Screaming Eagle Road to bring the angle of the intersection closer to 90 degrees
which will improve safety as well as widening Screaming Eagle Road to provide left and right turn lanes to improve capacity.
Percival Road will also be widened to provide a left turn lane onto Screaming Eagle Road.
SCDOT PIN: P030840
District: 09, 10
PM: Mohammed Al-Tofan
Design: Cox & Dinkins, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS
Based on Council approval, this project will be descoped to leaving it in its current location and improve the current
intersection by adding a turning lane to address the LOS at the 4
th
leg, which is the only one with capacity issues. Install the
traffic signal as planned. Staff met with the OET on 1/19 to discuss the project. It was determined that there may be better
options for this intersection so the OET will review and determine the best one.
Activities since last period: Once OET determines best layout option, their scope will be modified to finish design.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$64,284.54
$58,383.94
Professional Srvs
$307,217.50
$225,881.71
Right of Way
$22,525.00
$22,525.00
Construction
$1,205,972.96
$0
Page 27
MONTHLY PROGRESS REPORT
SHOP RD. EXTENSION PHASE 2
Project 324 | District 10, 11
SCOPE
The proposed descope includes proceeding with Alternate 4 from Shop Rd. Ext. Ph. 1 to Montgomery Ln. and then allow
traffic to continue on Montgomery. Also, perform any needed intersection improvements along Montgomery\Old Hopkins,
and add improve safety at existing railroad crossing.
SCDOT PIN: P038204
District: 10, 11
PM: Kim Toney
Design: TBD
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS
Activities since last period: PM has reached out to OET CECS, Inc. to provide a final scope for this project.
Activities for next period: OET to submit final scope service order and fee proposal.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$87,194.10
$70,002.85
Professional Srvs
$2,916,524.00
$827,283.65
Right of Way
$4,155,000.00
$0
Construction
$19,841,281.90
$0
Page 28
January 2021
INNOVISTA – GREENE ST. PHASE 2
Project 321 | District 05
SCOPE
This project consists of converting Greene Street from a 4-lane and 2-lane roadway to a 3-lane curb and gutter roadway with
sidewalks and dedicated bike lanes from Huger Street to Gadsden Street. Additionally, this project includes a new bridge
over the Norfolk Southern and CSX railroads to reconnect Greene Street. The project also includes permanently closing
Devine Street between Pulaski Street and Gadsden Street and Gadsden Street behind the USC Greek Village at the Norfolk
Southern crossings once the Greene Street roadway and bridge are open to traffic.
SCDOT PIN: P038231
District: 05
PM: Ali Eliadorani
Design: HDR
Construction: Crowder
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - Construction is approximately 29% complete with Roadway/Flatwork at 28%. Utilities continue with
relocating. Storm drainage installation is in progress.
Activities since last period: Continued installing panel for MSE Wall #6. Began and Continued installation of drainage
system along MSE Walls #1, #2, #3, and #4. Began and continued placing structural fill utilizing screenings from off-site
source. Utility relocation continued. Continued installing panels along MSE Walls #1, #2, #3, and #4.
Activities for next period: Continue installation of MSE walls 1-4 and End Bent 1. Electrical and signal installation on
Gadsden St., Greene St. and Huger St. Set girders spans A and C.
Issues and resolutions: All issues causing delays have been addressed. Delays will be accounted for with a change order.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$800,000.00
$721,387.04
Professional Srvs
$1,322,404.00
$1,582,541.14
Right of Way
$2,098,821.00
$1624,111.64
Util.\Const.\RR
$20,479,949.96
$8,604,241.64
Page 29
MONTHLY PROGRESS REPORT
BROAD RIVER CORRIDOR NIP
Project 330 | District 02, 04, 05
SCOPE
The scope of the proposed neighborhood improvement project(s) will be determined in Phase 1 (concept phase) of this
project. Project(s) and scope options will be selected directly from the approved Richland County Neighborhood Master Plan
and refined based upon public and stakeholder input and available funding.
District: 02, 04, 05
PM: Allison Steele
Design: Parrish & Partners, LLC
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS - The Concept Report was completed on April 8, 2019 and approved by County Council on May 7, 2019.
The plan proposes intersection improvements at Bush River Rd., St. Andrews Rd., and Greystone Blvd. SCDOT also currently
has a proposed safety improvement project along this corridor, with improvements broken up into short, mid and long-term
solutions. The County will discuss with SCDOT the option of adding some of their solutions to our project since they do not
currently have enough funding to complete all of them.
Activities since last period: Met with SCDOT on Nov. 23 to finalize items to add to scope.
Activities for next period: Reach out to OET to begin design.
PHASE
*2020 Q4 ESTIMATE
EXPENDED TO DATE
Personnel
$30,000.00
$1,170.89
Professional Srvs
$2,000,000.00
$99,204.58
Right of Way
$5,600,000.00
$0
Construction
$14,200,397.71
$0
Page 30
January 2021
CRANE CREEK NIP
Project 328 | District 04, 07
SCOPE
The scope of this project was determined in Phase 1 (concept phase) and was selected directly from the approved Richland
County Neighborhood Master Plan and refined based public and stakeholder input and available funding. The project will be
further broken down into two phases. Phase 2 will include (1) new sidewalk and streetscape improvements along Blue Ridge
Terrace, Heyward Brockington Road, and Crane Church Road; and (2) streetscape improvements along Monticello Road.
Phase 3 will include new sidewalks along Dakota Drive, Seagull Lane, Roberson Street, and Lincolnshire North Drive.
Project Length: 11.13 Mi
District: 04, 07
PM: Rasheed Muwwakkil, Sr.
Design: Cox & Dinkins, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - Design services for both phases 2 and 3 are underway.
Activities since last period: For Dakota Drive, the survey is completed and the OET is working on plans and preliminary
layout to determine the best alignment. Secondly, for Seagull Lane, the survey control set and research are almost
complete. The ROW data is almost complete. Thirdly, for Roberson Street, the survey control set and research are almost
complete. The ROW data is almost complete. Lastly, for Lincolnshire North Drive, the fieldwork is complete and the OET is
finalizing the survey. They have started on the preliminary plan set.
Activities for next period: Continue with design. Waiting on SCDOT to approve the Phase II plans.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$84,886.07
$39,540.60
Professional Srvs
$1,645,297.88
$910,051.54
Right of Way
$71,500.00
$0
Construction
$4,735,315.94
$0
Page 31
MONTHLY PROGRESS REPORT
DECKER\WOODFIELD NIP
Project 326 | District 03, 08, 10
SCOPE
The scope of the proposed neighborhood improvement project was determined in Phase 1 (concept phase) of this project.
The project scope was selected directly from the approved Richland County Neighborhood Master Plan and refined based on
public and stakeholder input and available funding. The project will be further broken down into two phases. Phase 2 will
include design and plan development for Brookfield Sidewalk, Faraway Sidewalk and the Chatsworth Pedestrian Connector.
Phase 3 will include Decker Blvd Streetscape improvements including intersection improvements along Decker Blvd.
Project Length: 4.00 Mi
District: 03, 08, 10
PM: Mohammed Al-Tofan
Design: Holt Consulting Co.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - Faraway Dr. Sidewalk is ready to begin construction and design of Brookfield\Chatsworth Sidewalk is 96%
complete.
Activities since last period: Faraway Dr pre-con is scheduled for Feb. 2nd.
Activities for next period: A pre-con for Faraway Dr. OET to finalize design for Brookfield\Chatsworth.
Issues and resolutions: The Recreation Commission is drafting an agreement to take over future maintenance of the
Chatsworth Connector.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$178,103.35
$96,334.35
Professional Srvs
$1,027,869.40
$708,776.52
Right of Way
$970,020.00
$8,520.00
Construction
$5,824,007.25
$0
Page 32
January 2021
SERN NIP
Project 318 | District 11
SCOPE
The Southeast Richland Neighborhood Master Plan includes three projects that are included in the Transportation Penny
Program. The three projects are: (1) Multi-use path on Rabbit Run from Garners Park Road to Lower Richland Blvd;
(2) Multi-use path on Lower Richland Blvd from Rabbit Run to the High School; (3) Garners Park Road: 2-lane road on new
location from US 76/378 (Garners Ferry Road)/Garners Ferry Sports Complex to S-2089 (Rabbit Run), approximately 0.5
miles. A fourth project was included to correct an existing drainage problem with Rabbit Run.
SCDOT PIN: P029379
District: 11
PM: Kim Toney
Design: PDT
Construction: McClam and Associates
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - Construction of the project is
approximately 90% complete.
Activities since last period: Lower Richland Blvd. SUP construction is complete.
Activities for next period: Completion of Connector Road SUP, completion of Garners Ferry Rd. median and asphalt work,
completion of Lower Richland Blvd. fence railing work.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$300,000.00
$273,345.89
Professional Srvs
$952,812.03
$784,686.59
Right of Way
$263,856.43
$263,856.43
Construction
$3,850,464.80
$2,950,903.58
Page 33
MONTHLY PROGRESS REPORT
TRENHOLM ACRES\NEWCASTLE NIP
Project 329 | District 03
SCOPE
The scope of the proposed neighborhood improvement project(s) will be determined in Phase 1 (concept phase) of this
project. Project(s) and scope options will be selected directly from the approved Richland County Neighborhood Master Plan
and refined based upon public and stakeholder input and available funding.
Project Length: 8.83 Mi
District: 03
PM: Mohammed Al-Tofan
Design: Chao & Associates
Name District(s) Status
1 Claudia Drive Sidewalk (Humphrey Dr to Roof St)
03
Design Phase
2 Humphrey Drive Sidewalk (Shakespeare Rd to Parkingson Dr)
03
Design Phase
3 Nancy Avenue Sidewalk (Humphrey Dr to Roof St)
03
Design Phase
4 Shakespeare Road Sidewalk (Fontaine Rd to Roof St)
03
Design Phase
5 Sprott Street Sidewalk (Humphrey Dr to Hearn Dr)
03
Design Phase
6 Warner Drive Sidewalk (Fontaine Rd to Westmore Dr)
03
Design Phase
7 Westmore Drive Sidewalk (Frontage Rd to Humphrey Dr)
03
Design Phase
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS
Activities since last period:
Activities for next period: Finalize and execute a service order for the OET
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$9,893.09
$2,343.36
Professional Srvs
$697,000.00
$109,525.04
Right of Way
$14,000.00
$0
Construction
$4,179,106.91
$0
Page 34
January 2021
COLUMBIA MALL GREENWAY
Project 131 | District 03, 08
SCOPE
The proposed project is a greenway which bypasses the congested areas around Columbia Mall, beginning at Trenholm Road
North of O'Neil Ct. to Trenholm Road South of Dent Middle School.
Project Length: 1.2 Mi
District: 03, 08
PM: Allison Steele
Design: TBD
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS – This project is being evaluated to determine what can be accomplished with the funding approved for it.
Activities since last period:
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$2,864.24
$0
Professional Srvs
$100,000.00
$0
Right of Way
$25,000.00
$0
Construction
$520,591.76
$0
Page 35
MONTHLY PROGRESS REPORT
CRANE CREEK GREENWAY
Project 133 | District 04
SCOPE
The scope of the proposed Greenway(s) will be determined in Phase 1 (concept phase) of this project and refined based on
public and stakeholder input and available funding. Proposed project sections include: 1) Section A: Canal Riverwalk to
Monticello Rd; 2) Section B: Canal Riverwalk to Mountain Drive; 3) Section C: Canal Riverwalk to CIU campus. Council has
approved changes to this greenway. Only Section B will be constructed and funding from Sections A and C will be
transferred to this phase.
Project Length: 0.76 Mi.
District: 04
PM: Mohammed Al-Tofan
Design: Cox & Dinkins, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS – Staff is working with the OET to develop a final scope and to address any City concept
comments.
Activities since last period: Phase 2 design scope finalization. The City of Columbia provided comments for the scope so
it has been updated to address these comments.
Activities for next period: Negotiate a fee with the OET and execute a service order with them.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$24,629.72
$270.92
Professional Srvs
$313,820.51
$124,583.12
Right of Way
$176,000.00
$0
Construction
$1,760,997.02
$0
Page 36
January 2021
Project 136 | District 06
SCOPE
The scope of this project was identified in Phase 1 (concept phase) of this project, and was based on public and
stakeholder input, impact studies, and costs. Phase 2 scope includes approximately two thousand five hundred (2,500)
linear feet of a greenway and trail with boardwalks and supporting facilities that extend along Gills Creek from S-2205
(Beecliff Drive) to S-407 (Mikell Lane). Phase 3 scope includes approximately two thousand four hundred fifty (2,450)
linear feet of a greenway and trail with boardwalks and supporting facilities that extend along Gills Creek from SC 760
(Fort Jackson Boulevard) to S-2205 (Beecliff Drive). Phase 4 includes approximately 2,600’ of greenway and boardwalks
from S-2205 (Beecliff Drive) down to Timberlane Dr.
Project Length: 1.0 Mi.
District: 06
PM: Jeff McNesby
Design: Holt Consulting Company, LLC
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS – Phase 2 design is 70% complete, and Phase 3 design is 70%.
Activities since last period: A site visit was held on January 27
th
with the OET and the City to determine a final layout for the
greenway.
Activities for next period: OET to finalize design. OET to analyze the use of an existing portion of Timberlane Dr. as part of
the pathway. The majority of roads on this portion of road were bought out after the 2015 flood.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$77,373.51
$36,398.43
Professional Srvs
$1,819,177.27
$490,982.19
Right of Way
$0
$0
Construction
$4,392,688.96
$231,527.16
Page 37
MONTHLY PROGRESS REPORT
POLO RD\WINDSOR LAKE GREENWAY
Project 140 | District 08
SCOPE
The scope of the proposed Greenway(s) will be a new 4,000 LF greenway from Windsor Lake Boulevard to the intersection of
Alpine Road and Polo Road.
Project Length: 0.76 Mi.
District: 08
PM: Ali Eliadorani
Design: TBD
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS
Council held a Greenway Work Session on July 23, 2019 regarding reallocation of funds within the Greenway Program.
Council has approved changes at all three readings. This project did not have changes to the scope; however, Council did
approve to not proceed with the Dutchman Blvd. and the Old Leesburg Greenways so their funding will be added to this
project.
Activities since last period: Greenway Information Meeting was held on March 11, 2020
Activities for next period: Assign the project to an OET
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$4,596.64
$0
Professional Srvs
$196,308.96
$0
Right of Way
$35,000.00
$0
Construction
$371,052.40
$0
Page 38
January 2021
SMITH\ROCKY BRANCH GREENWAY
Project 143 | District 04
SCOPE
The scope of the proposed Greenway(s) will be determined in Phase 1 (concept phase) of this project and refined based on
public and stakeholder input and available funding. Proposed project sections include: 1) Section A: Northern Three Rivers
to Clement Road; 2) Section B: Clement Road to Colonial Drive; 3) Section C: Granby Park to Gervais Street. Council held a
Greenway Work Session on July 23, 2019 regarding reallocation of funds within the Greenway Program.
Council has approved changes at all three readings. Only Section C will be constructed and funding from Sections A and
B will be transferred to this phase.
Project Length: 1.70 Mi.
District: 04
PM: Rasheed Muwwakkil, Sr.
Design: Holt Consulting, Inc.
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Design
COST STATUS
PUBLIC STATUS – OET has begun the complete design for this project.
Activities since last period: The OET has held meetings with all stakeholders including the City, Vulcan, NS and CSX. They
have also performed a site visit with their surveyor, environmental specialist to review the alignment. Rights-of-Entry and
insurance for railroad survey work is in place and field surveying has begun.
Activities for next period: Finalize survey work.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$33,031.85
$0
Professional Srvs
$630,844.57
$139,691.80
Right of Way
$320,000.00
$0
Construction
$1,815,997.15
$0
Page 39
MONTHLY PROGRESS REPORT
THREE RIVERS GREENWAY
Project 144 | District 05
SCOPE
The proposed Three Rivers Greenway Extension Ph. 1 project incorporates an 8-foot-wide concrete trail that undulates from
I-26 along the Saluda River, and continues past Riverbanks Zoo to the confluence of the Saluda and Broad Rivers. Features of
the greenway will include boardwalks, a maintenance building, security lighting, renovated boat ramp, parking lot,
environmentally friendly public restrooms, signage and information kiosks.
Project Length: 3.2 Mi.
District: 05
PM: Kim Toney
Design: Ken Simmons
Construction: AOS Specialty
SCHEDULE
ACTIVITY NAME
2015
2016
2017
2018
2019
2020
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - Construction of the project is approximately 95% complete. The project has been broken into
two phases, Phase 1A is the completed portion from I-26 to the railroad scoured area, and Phase 1B is from the
railroad scoured area to the Boyd Island Connector.
Activities since last period: Council approved annexation of 2 properties into the City in order for City to maintain. The City
zoning commission voted yes during the first and second readings, and third reading will be 2/2/21.
Activities for next period: Finalize as-builts, execute IGA, and turn Ph. 1A over to the City. Begin construction of Ph. 1B.
Issues and resolutions: The Phase 1B Boyd Island Connection has encountered a delay due to the high water levels of the
Saluda River and cannot install the cofferdam. It is estimated that this work will begin when the river water levels recede in
late Spring and early Summer. The estimated completion date is September 30, 2021.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$746,120.11
$575,503.17
Professional Srvs
$99,194.00
$89,699.66
Right of Way
$192,040.00
$50,340.00
Construction
$6,864,887.89
$6,541,210.88
Page 40
January 2021
ALPINE RD. SIDEWALK (TWO NOTCH RD TO PERCIVAL RD)
Project 146 | District 03, 08, 10
SCOPE
Scope includes resurfacing of Alpine Rd from Two Notch Rd to Percival Rd and a sidewalk will be constructed on one side.
Project includes SCDOT resurfacing funds.
Project Length: 2.4 Mi.
District: 03, 08, 10
PM: Rasheed Muwwakkil, Sr.
Design: Mead & Hunt
SCHEDULE
ACTIVITY NAME
2016
2017
2018
2019
2020
2021
Design
Right of Way
Utilities
Construction
COST STATUS
* Note: Funding includes $803K in Federal Resurfacing funds and
a $180K Federal TAP Grant. Note: Referendum amount includes
Sidewalk and Bikeway project funds.
PUBLIC STATUS - The County is in the process of putting the necessary documents together to prepare the project for
advertisement. The final design has been approved, and signed\sealed plans have been received by the County.
Activities since last period: OET has submitted plans for MS4 approval.
Activities for next period: Once the land disturbance permit is obtained this project will be advertised.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$39,547.64
$50,497.55
Professional Srvs
$620,000.00
$307,716.52
Right of Way
$29,176.80
$59,100.00
Construction
$4,604,864.33
$181,298.77
Page 41
MONTHLY PROGRESS REPORT
HARRISON RD. SIDEWALK Package S12(TWO NOTCH RD TO FOREST DR)
Project 164 | District 03
SCOPE
Project consists of a 5 ft. wide sidewalk on one side of Harrison Road from Two Notch Road to Forest Drive.
Project Length: 1.2 Mi.
District: 03
PM: Rasheed Muwwakkil, Sr.
Design: Mead & Hunt
Construction: AOS Specialty
SCHEDULE
ACTIVITY NAME
2016
2017
2018
2019
2020
2021
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS – The construction is approximately 99% complete.
Activities since last period: The Contractor has completed the construction of the Concrete Sidewalk, Concrete Curb &
Gutter and Concrete Driveway. They also completed the installation of Smooth Pipe, Drop Inlets, Catch Basins and Junction
Boxes. This project is substantially complete. Richland County, the contractor and SCDOT conducted the final inspection.
The contractor is currently working on correcting the punch list items.
Activities for next period: Contractor to submit closeout documents and final pay app.
Issues and resolutions: Richland County is waiting on a decision from SCDOT on two of the punch list items due to decisions
made by the SCDOT Pre-construction that classified the project to meet existing conditions.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$90,000.00
$83,102.28
Professional Srvs
$270,000.00
$247,937.53
Right of Way
$96,240.00
$92,165.00
Construction
$1,739,477.95
$1,704,124.01
Page 42
January 2021
PERCIVAL RD. SIDEWALK (FOREST DR TO DECKER BLVD)
Project 178 | District 06, 08, 10
SCOPE
Project consists of a 5 ft. wide concrete sidewalk on one side along Percival Road from Forest Drive to Decker Boulevard.
Project Length: 1.5 Mi.
District: 06, 08, 10
PM: Mohammed Al-Tofan
Design: Holt Consulting
SCHEDULE
ACTIVITY NAME
2016
2017
2018
2019
2020
2021
Design
Right of Way
Utilities
Construction
COST STATUS
* Note: Funding for this project includes $2.5M in CTC funds.
PUBLIC STATUS - 70% Complete Final Right-of-Way plans have been prepared. Staff now has a ROW Manager available
through staff augmentation to finalize any outstanding ROW issues for this project.
Activities since last period: OET is still working to finalize construction plans.
Activities for next period: OET to finalize plans and receive SCDOT approval.
Issues and resolutions: Any remaining utility coordination will need to be finalized before the project is advertised.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$170,000.00
$152,680.44
Professional Srvs
$344,353.20
$237,419.20
Right of Way
$7,140.00
$1,350.00
Construction
$2,076,995.18
$0
Page 43
MONTHLY PROGRESS REPORT
POLO RD. SIDEWALK Package S13 (MALLET HILL RD TO ALPINE RD)
Project 180 | District 08, 09, 10
SCOPE
Project consists of a shared-use path along the north side of Polo Rd. from Alpine Rd. to Mallet Hill Rd.
Project Length: 1.7 Mi.
District: 08, 09, 10
PM: Mohammed Al-Tofan
Design: Mead & Hunt
Construction: Palmetto Sitework
SCHEDULE
ACTIVITY NAME
2016
2017
2018
2019
2020
2021
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS - Construction is 87% complete and ahead of schedule.
Activities since last period: Sidewalk installation, grading the slopes and ditches, backfilling between the curb and sidewalk.
Activities for next period: Finalize construction and prepare for final walkthrough.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$150,000.00
$137,713.26
Professional Srvs
$235,000.00
$202,235.87
Right of Way
$251,690.00
$186,844.07
Construction
$1,919,781.50
$1,407,348.79
Page 44
January 2021
SIDEWALK PACKAGE S-10 CLEMSON RD. PH. 1 SIDEWALK
Project 769 | District 09, 10
SCOPE
Project scope includes the design and construction of 5-foot concrete sidewalks along the following road: Clemson Road
Phase 1 (Frontage Rd to Percival).
Project Length: 0.41 Mi.
District: 09, 10
PM: Rasheed Muwwakkil, Sr.
Design: PDT
SCHEDULE
ACTIVITY NAME
2018
2019
2020
2021
2022
2023
Construction
COST STATUS
PUBLIC STATUS - The lower bidder from the first advertisement did not submit all required paperwork so the project had
to be re-advertised.
Activities since last period: The project was re-advertised and the second bid opening will be held February 15th.
Activities for next period: Submit to Committee to award to new lowest, responsive, responsible bidder.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$11,310.12
$3,223.31
Professional Srvs
$36,593.20
$22,281.80
Right of Way
$2,859.18
$0
Construction
$341,293.24
$18,310.37
Page 45
MONTHLY PROGRESS REPORT
SIDEWALK PROGRAM
Project 41
SCOPE
Scope includes the planning, design and construction of sidewalks in Richland County as identified in the 2012
Transportation Sales Tax Referendum.
1 Alpine Rd Sidewalk (Two Notch Rd to Percival Rd)
3, 8, 10
2021 Construction
2 Leesburg Rd. Sidewalk (Garners Ferry Rd to Semmes Rd)
11
2021 Construction
3 Percival Rd Sidewalk (Forest Dr to Decker Blvd)
6
2021 Construction
4 Polo Rd Sidewalk (Mallet Hill Rd to Alpine Rd)
8, 9, 10
Under Construction
5 Clemson Rd Sidewalk (Two Notch Rd to Percival Rd)
9, 10
Advertised
6 Harrison Rd Sidewalk (Two Notch Rd to Forest Dr)
3
Under Construction
7 Clemson Rd Sidewalk (Longtown Rd to Two Notch Rd)
7, 8, 9
Project Complete
8 Atlas Rd Sidewalk (Fountain Lake Way to Garners Ferry Rd)
11
Construct with Widening
9 Prospect Rd Sidewalk (Wilmot Ave to Yale St)
5
Deferred by Council based on public input
10 Shandon St Sidewalk (Rosewood Dr to Heyward St)
5
Deferred by Council based on public input
11 Shandon St Sidewalk (Wilmot Ave to Wheat St)
5
Deferred by Council based on public input
12 Bluff Rd Sidewalk (Rosewood Dr to Beltline Blvd)
10
In Design. Construct with Widening.
13 Broad River Rd Sidewalk (Royal Tower Rd to Woodrow St)
1
In Design. Construct with Widening.
14 Lower Richland Sidewalk (Rabbit Run Rd to Garners Ferry Rd)
11
In Design. Construct with Widening.
15 Polo Rd Sidewalk (Two Notch Rd to Mallet Hill Rd)
8, 9, 10
In Design. Construct with Widening.
16 Sunset Dr Sidewalk (Elmhurst Rd to River Dr)
4
Design underway. 2021 Construction.
17 Magnolia St Sidewalk (Two Notch Rd to Pinehurst Rd)
3
Project Complete
18 School House Rd Sidewalk (Two Notch Rd to Ervin St)
3
Project Complete
19 Koon Rd Sidewalk (Malinda Rd to Farmview St)
3
Project Complete
20 Assembly St Sidewalk (Whaley St to Beltline Blvd)
5, 10
Planning (pending approval)
21 Broad River Rd Sidewalk (Harbison Blvd to Bush River Rd)
2, 4, 5
Planning (pending approval)
22 Broad River/LMB Sidewalk (I-26 to Harbison Blvd)
2
Planning (pending approval)
23 Fort Jackson Blvd Sidewalk (Wildcat Rd to I-77)
6
Planning (pending approval)
24 Huger St Sidewalk (Blossom St to Gervais St)
5
Planning (pending approval)
25 Two Notch Rd Sidewalk (Alpine Rd to Spears Creek Church)
3, 7, 8, 9
Planning (pending approval)
26 Blossom St. Sidewalk (Williams St to Huger St)
5
Project Complete
27 Blythewood Rd Sidewalk (I-77 to Main St)
2
Project Complete
28 Bratton St Sidewalk (King St to Maple St)
5
Project Complete
29 Broad River Rd Sidewalk (Greystone Blvd to Broad River
4, 5
Project Complete
30 Calhoun St Sidewalk (Gadsden St to Wayne St)
4
Project Complete
31 Colonial Dr Sidewalk (Harden St to Academy St)
4
Project Complete
32 Columbiana Dr Sidewalk (Lex. Co. Line to Lake Murray Blvd)
2
Project Complete
33 Franklin St Sidewalk (Sumter St. to Bull St)
4
Project Complete
34 Gervais St. Sidewalk (Gist St. to 450' w Gist)
5
Project Complete
35 Gervais St. Sidewalk (Gist St. to Huger St.)
5
Project Complete
36 Grand St Sidewalk (Shealy St to Hydrick St)
4
Project Complete
37 Jefferson St Sidewalk (Sumter St. to Bull St)
4
Project Complete
Page 46
January 2021
38 Laurel St Sidewalk (Gadsden St to Pulaski St)
4, 5
Project Complete
Name
District
(s)
Status
39 Lincoln St Sidewalk (Heyward St to Whaley St)
5
Project Complete
40 Lyon St Sidewalk (Gervais St. to Washington St)
5
Project Complete
41 Maple St Sidewalk (Kirby St to Gervais St)
6
Project Complete
42 Mildred Ave Sidewalk (Westwood Ave to Duke Ave)
4
Project Complete
43 Pelham Dr Sidewalk (Gills Creek Pkwy to Garners Ferry Rd)
6
Project Complete
44 Pinehurst Rd Sidewalk (Harrison Rd to Forest Dr)
3
Project Complete
45 Royster St Sidewalk (Capers Avenue))
10
Project Complete
46 Senate St Sidewalk (Gladden St to King St)
5, 6
Project Complete
47 Superior St Sidewalk (Marion Street)
5,10
Project Complete
48 Tryon St Sidewalk (Catawba Ave to Heyward St)
5
Project Complete
49 Veterans Rd Sidewalk (Garners Ferry Rd to Wormwood Dr)
11
Project Complete
50 Veterans Rd Sidewalk (Coachmaker Rd to Coatsdale Rd)
6, 11
Project Complete
51 Wayne St Sidewalk (Calhoun St to Laurel St)
4, 5
Project Complete
52 Wildwood Ave Sidewalk (Monticello Rd to Ridgewood Ave)
4
Project Complete
53 Wiley St Sidewalk (Superior St to Edisto Ave)
10
Project Complete
54 Windover St Sidewalk (Two Notch Rd to Belvedere Dr)
3
Project Complete
55 Broad River Rd Sidewalk (Lake Murray Blvd to Western Ln)
1
Unfunded in Referendum
56 Park St Sidewalk (Gervais St to Senate St)
5
Assigned to City
On August 1, 2019, County Council approved continuing project
development, including construction, of all except for six
sidewalks (currently with status of "Planning") within the
Sidewalk Category. After construction begins on all other
sidewalks, County will need to determine remaining available
funding within the Sidewalk Category and make decisions
regarding the remaining six.
Page 47
MONTHLY PROGRESS REPORT
SUNSET DR. SIDEWALK (ELMHURST RD TO RIVER DR)
Project 187 | District 04
SCOPE
Project consists of a 5 ft. wide sidewalk along the north side of Sunset Dr. from River Dr. to Elmhurst Rd.
SCDOT PIN: P029406
Project Length: 0.75 Mi.
District: 04
PM: Jeff McNesby
Design: Mead & Hunt
SCHEDULE
ACTIVITY NAME
2017
2018
2019
2020
2021
2022
Design
Right of Way
Utilities
Construction
COST STATUS
PUBLIC STATUS
Right-of-Way acquisition services are nearly complete. 95% Construction Plans were submitted to SCDOT on May 24, 2019.
Awaiting SCDOT District Maintenance response regarding sanitary sewer outfall relocation.
Activities since last period:
Activities for next period: Get with OET to address remaining issues with sewer and drainage
Issues and resolutions: Catch basin cover SCDOT approval, sewer outfall, ROW finalizations
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$34,721.10
$36,314.35
Professional Srvs
$346,155.83
$366,324.52
Right of Way
$82,613.00
$23,580.00
Construction
$1,965,510.35
$102,464.46
Page 48
January 2021
BIKEWAY PROGRAM – ROAD DIETS
Project 785 | District 02, 04, 05
SCOPE
Road Diets are projects where a four-lane road is restriped to create a two-lane road with a center turn lane; and sharrows,
where vehicle and bike traffic share the road when there is not enough room for a bike lane. Originally, this project had six
identified roads, but two were removed due to safety concerns and coordination with USC's bikeway planning program.
1 Calhoun St Bikeways (Wayne St to Harden St)
04
Deferred at 3/19/2019 Council Meeting
2 Columbiana Dr Bikeways (Lake Murray Blvd to Lexington
County Line)
02
Removed from Program due to SCDOT design
restrictions
3 Hampton St Bikeways (Pickens St to Harden St)
04
Deferred at 3/19/2019 Council Meeting
4 Pendleton St Bikeways (Lincoln St to Marion St)
04, 05
Funding provided to USC
5 Pickens St Bikeways (Washington St to Rosewood Dr)
04, 05
6 Pickens St/Washington St/Wayne St Bikeways (Hampton
St (west) to Hampton St (east))
04, 05
Page 49
MONTHLY PROGRESS REPORT
BIKEWAY PROGRAM - RESTRIPING
Project 787 | District 02, 03, 04, 05, 06, 07, 08, 10, 11
Name
Comments
1 Alpine Rd Bike Lanes (Two Notch Rd to Percival Rd) Included in project 146- Alpine Rd. Sidewalk
2 Beltline Blvd Bikeways (Forest Dr to Valley Rd) Removed from program by SCDOT due to design restrictions.
3 Beltline Blvd Bikeways (Rosewood Dr to Devine St) Combine with future SCDOT Resurfacing Project. SCDOT to
construct.
4 Beltline Blvd/Colonial Dr/Farrow Rd Bikeways (Harden St Removed from program by SCDOT due to design restrictions.
to Academy St)
5 Beltline Blvd/Devine St Bikeways (Rosewood Dr to Combine with future SCDOT Resurfacing Project. SCDOT to
Chateau Dr) construct.
6 Blossom St Bikeways (Assembly St to Sumter St) Removed from program by SCDOT due to design restrictions.
7 Blossom St Bikeways (Huger St to Assembly St) SCDOT to replace Blossom St. bridge over RR. SCDOT to
construct.
8 Blythewood Rd Bikeways (Winnsboro Rd to Main St) A segment is included as a part of project 273- Blythewood
Rd. Widening
9 Broad River Rd Bikeways (Bush River Rd to Greystone Removed from program by SCDOT due to design restrictions.
Blvd)
10 Broad River Rd Bike Lanes (Greystone Blvd to Broad Removed from program by SCDOT due to design restrictions.
River Bridge)
11 Bull St Bikeways (Elmwood Ave to Victoria St) Removed from program by SCDOT due to design restrictions.
12 Clemson Rd Bikeways (Brook Hollow Dr to Summit Pky) Combine with future SCDOT Resurfacing Project. SCDOT to
construct.
13 Clemson Rd Bikeways (Longtown Rd to Brook Hollow
Combine with future SCDOT Resurfacing Project. SCDOT to
Dr) construct.
14 College St Bikeways (Lincoln St to Sumter St) Funding provided to USC
15 Decker Blvd/Parklane Rd/Two Notch Rd Bikeways (Two
Notch Rd to Percival Rd)
16 Garners Ferry Rd Bikeways (Rosewood Dr to True St)
17 Huger St Bikeways (Blossom St to Gervais St)
18 Leesburg Rd Bikeways (Garners Ferry Rd to Semmes
Rd)
19 Lincoln St Bikeways (Blossom St to Lady St)
20 Main St Bikeways (Pendleton St to Whaley St)
21 Oneil Ct Bikeways (Decker Blvd to Parklane Rd)
22 Rosewood Dr Bikeways (Bluff Rd to Garners Ferry Rd)
23 Shop Rd Bikeways (Beltline Blvd to Pineview Dr)
24 Sumter St Bikeways (Washington St to Senate St)
25 Whaley St Bike Lanes (Lincoln St to Pickens St)
26 Wheat St Bikeways (Harden St to King St)
Removed from program by SCDOT due to design restrictions
Removed from program by SCDOT due to design restrictions.
Removed from program by SCDOT due to design restrictions.
SCDOT widening with bike lanes from Fairmont to Semmes.
Removed from program by SCDOT due to design restrictions.
Funding provided to USC
Completed by SCDOT.
Removed from program by SCDOT due to design restrictions.
Removed from program by SCDOT due to design restrictions.
Removed from program by SCDOT due to design restrictions.
Restripe from Main to Pickens.
Removed from program by SCDOT due to design restrictions
Page 50
January 2021
BIKEWAY PROGRAM – SHARED USE PATHS
Project 786 | District 02, 03, 04, 05, 07, 08, 09, 10
SCOPE
Shared Use Paths are paths over 5 feet wide used for bicyclists and pedestrians. Eight projects were identified in the 2012
Referendum. In 2019, Council voted to remove SUPs from future projects, so these projects listed below will focus on
bikeway installation.
Project District Status
1. Assembly St Bikeways (Blossom to Rosewood) 10 Concept Report Prepared
2. Assembly St Bikeways (Blossom to Rosewood) 05, 10 Concept Report Prepared
3. Broad River Rd. Bikeways (Harbison to Bush River) 02, 04, 05 Planning Phase
4. Broad River\Lake Murray Blvd (I-26 to Harbison) 02 Planning Phase
5. Clemson Rd Bikeways (Summit Pkwy to Percival) 08, 09, 10 Portion incl. in Clemson Widening
6. Colonial Dr. Bikeways (Bull to Slighs) 04 Planning Phase
7. Dutchman Blvd Bikeways (Broad River to Lake Murray) 02 Rem. Due to Development
8. Polo Rd. Bikeways (Two Notch to 640’ S. of Mallet Hill) 08, 09, 10 Incl. in Polo Rd. Widening
9. Two Notch Rd Bikeways (Alpine to Spears Creek Church) 03, 07, 08, 09 Planning Phase
Page 51
MONTHLY PROGRESS REPORT
PEDESTRIAN IMPROVEMENT PROJECTS - Project 767
SCOPE
The following improvements are proposed to be made to these intersections: (1) Installation of ADA compliant handicap
ramps where none currently exist and replacement of existing handicap ramps which are in a state of disrepair and/or do
not meet standards; (2) Installation of pedestrian signal appurtenances with push buttons; (3) Installation or replacement of
detectable warning surfaces; and (4) Installation or replacement of crosswalks.
PM: Kim Toney
Design: Mead & Hunt
Construction: AOS Specialty
Name
District(s)
Status
1 Assembly St and Calhoun St Pedestrian Improvements 04 Construction Complete
2 Assembly St and Gervais St Pedestrian Improvements 04, 05 Construction Complete
3 Assembly St and Laurel St Pedestrian Improvements 04 Construction Complete
4 Assembly St and Washington St Pedestrian Improvements 04, 05 Construction Complete
5 Blossom St and Saluda Ave Pedestrian Improvements 05 Construction Complete
6 Elmwood Ave and Park St Pedestrian Improvements 04 Construction Complete
7 Main St and Calhoun St Pedestrian Improvements 04 Construction Complete
8 Rosewood Dr and Beltline Blvd Pedestrian Improvements 05, 06 Construction Complete
9 Rosewood Dr and Harden St Pedestrian Improvements 05 Construction Complete
10 Rosewood Dr and Holly St Pedestrian Improvements 05 Construction Complete
11 Rosewood Dr and Marion St Pedestrian Improvements 05, 10 Construction Complete
12 Rosewood Dr and Ott Rd Pedestrian Improvements 05 Construction Complete
13 Rosewood Dr and Pickens St Pedestrian Improvements 05, 10 Construction Complete
14 Two Notch Rd and Brickyard Rd Pedestrian Improvements 08, 09 Construction Complete
15 Two Notch Rd and Maingate Dr/Windsor Lake Blvd Pedestrian Improvements 03 Construction Complete
16 Two Notch Rd and Sparkleberry Ln Pedestrian Improvements 09 Construction Complete
COST STATUS
PUBLIC STATUS – Final inspection complete. Project to be closed out.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$57,655.76
$30,860.24
Professional Srvs
$38,282.87
$28,282.87
Construction
$1,040,141.43
$521,943.25
Page 52
January 2021
DIRT ROAD PAVING PACKAGE “J” - Project 771
SCOPE
The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition,
unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement
markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland
County.
Project Length: 0.81 Mi
District: 01, 03, 05, 10
PM: Jeff McNesby
Construction: Cherokee, Inc.
Name District(s) Status
1 Ehrlich St
10
Construction Complete
2 Hall St
03
Construction Complete
3 Haven Cir
01
Construction Complete
4 Mrs Mack's Rd
01
Construction Complete
5 Summer Haven Dr
01
Construction Complete
6 Youngs Chapel Church Rd
05
Construction Complete
COST STATUS
PUBLIC STATUS – All roads substantially complete.
Activities since last period: Punchlist items completed.
Activities for next period: Contractor to submit closeout documents
PHASE
*2020 Q4 ESTIMATE
EXPENDED TO DATE
Personnel
$2,750.00
$1,959.94
Util\Const.
$874,197.57
$765,163.16
Page 53
MONTHLY PROGRESS REPORT
DIRT ROAD PAVING PACKAGE “K” - Project 788
SCOPE
The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition,
unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement
markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland
County.
Project Length: 0.952 Mi
District: 10, 11
PM: Jeff McNesby
Name District Status
1 Robert James Rd
10
Ready for advertisement
2 Rocky Rd
11
Ready for advertisement
3 Barkley Rd
11
Ready for advertisement
4 South Dr
10
Ready for advertisement
PUBLIC STATUS – Construction plans were advertised and bid opening was held on November 16, 2020.
Activities since last period: Pre-con has been scheduled for Feb. 9
th
.
Activities for next period: Contractor to begin construction.
Page 54
January 2021
DIRT ROAD PAVING PROJECTS YEARS 1 & 2 - Project 331
SCOPE
The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition,
unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement
markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland
County.
Project Length: 8.47 Mi District: 01, 02, 07, 08, 09, 10, 11
PM: Jeff McNesby Design: TBD
Road District Road District
1. Ashbury St 07 13. Ollie Daily Rd 01
2. Country Place Ln 10 14. Ravenbrook Rd 10
3. Dry Branch Way 10 15. Robert McKenzie Rd 10
4. Entzminger Rd 02 16. Rockerfella Ln 07
5. Goodwin Way 10 17. Sandhill Estates Rd 10
6. Grant Rd 11 18. Sassafras Rd 07
7. Jackson Rd 10 19. Smith Myers Rd 10
8. Ken Webber Rd 01 20. Smithcreek Rd 10
9. Lacaya Rd 02 21. South Scott Rd 10
10. Larger St 07 22. Spring Creek Rd 10
11. Nathan Ridge Ln 10 23. Taylor Arch Rd 10
12. Old Palmetto Cir 10 24. Twin Ponds Rd 02
25. Sara Matthews Rd 07
PUBLIC STATUS – Design is 70% complete. Consent\denial comments received from property owners along 21 roads
Activities since last period: Staff has reviewed remaining roads for ROW and has forwarded a list to Public Works to verify
and to obtain ROW as needed.
Activities for next period: Staff is working with the current OETs to finalize design on Ken Webber, Larger, Nathan Ridge,
Ollie Daily, Ravenbrook and Sara Matthews.
Page 55
MONTHLY PROGRESS REPORT
DIRT ROAD PAVING PROJECTS YEARS 3 & 4 - Project 417
SCOPE
The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition,
unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement
markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland
County.
Project Length: 10.72 Mi District: 01, 02, 07, 08, 09, 10, 11
PM: Jeff McNesby Design: TBD
Road District Road District
1. Bow String Rd 09 12. Pilgrim Church Rd 07
2. Cornell Adams Run 11 13. Rosa Dowdy Ln 10
3. Davis Smith Rd 07 14. Sam Dubard Rd 07
4. Dogwood Shores Ln 11 15. Sandy St 09
5. Faust St 03 16. Snow Rd 07
6. Governor Pond Rd 07 17. Stone House Rd 01
7. H L Clarkson Rd 10 18. Tall Oaks Dr 01
8. High Valley Trl 07 19. Vallenga Rd 09
9. Lake Dogwood Cir S 11 20. Wessinger Ln 07
10. Maggie Hipp Rd 02 21. Wider Rd 11
11. Melton Rd 09 22. Wilson McCoy Rd 10
PUBLIC STATUS – Council directed staff to relaunch projects. Design is 70% complete.
Activities since last period: OET has begun to finalize design on roads were ROW has been obtained.
Activities for next period: OET to finalize designs for Bow String, Cornell Adams, Dogwood Shores, Lake Dogwood, and
Vallenga
Page 56
January 2021
RESURFACING PACKAGE “P” - Project 765
SCOPE
Scope includes concrete pavement patching, cleaning and resealing of joints, and routing, cleaning and sealing of random
cracks in pavements of approximately 3.05 miles of roadway (24 roads) and the milling, full depth patching, and/or
resurfacing of approximately 9.42 miles of asphalt roadway (57 roads).
Project Length: 12.47 Mi
District: 01, 02, 07, 08, 09, 10, 11
PM: Rasheed Muwwakkil, Sr.
Construction: Palmetto Corp. of Conway
Name District(s) Status Name District(s) Status Name District(s) Status
1 W Ashford Court 01 Complete 28 Arborland Court 02 Complete 55 Grayside Road 01 Complete
2 Billsdale Court 01 Complete 29 Ashleys Place 11 Complete 56 Grey Oak Lane 02 Complete
3 Billsdale Road 01 Complete 30 Azalea Circle 02 Complete 57 Greys Court 11 Complete
4 Bradford Lane 09 Complete 31 Ballentine Point Rd 01 Complete 58 Hawks Ridge Lane 01 Complete
5 Chadford Road 01 Complete 32 Battery Road 01 Complete 59 Jadetree Court 11 Complete
6 Crossthorn Road 01 Complete 33 Bedford Way 11 Complete 60 Key Road 10 Complete
7 Dowgate Hill Court 08 Complete 34 Bent Oak Court 07 Complete 61 Kristyben Court 01 Complete
8 Falmouth Rise Road 08 Complete 35 Berkeley Forest Ct 11 Complete 62 Lely Court 01 Complete
9 Hampstead Court 08 Complete 36 Birchbark Court 08 Complete 63 Maid Lynn Court 01 Complete
10 Ixworth Green 08 Complete 37 Blackburn Road 01 Complete 64 North Palace Court 02 Complete
11 Lambeth Walk 08 Complete 38 Blue Bird Trail 01 Complete 65 Oak Knoll Drive 02 Complete
12 Lyne Cove Court 01 Complete 39 Bonbon Lane 07 Complete 66 Oakleaf Circle 02 Complete
13 Newgate End 08 Complete 40 Boulters Lock Road 01 Complete 67 Old Garners Ferry 11 Complete
14 Oak Hampton Road 01 Complete 41 Bronlow Drive 01 Complete 68 Old Tree Court 02 Complete
15 Polo Ridge Circle 08, 09 Complete 42 Brook Hollow Drive 08 Complete 69 Padgett Woods Blvd 11 Complete
16 Rainsborough Way 08 Complete 43 Carolee Court 01 Complete 70 Penningail Court 01 Complete
17 Ramsbury Court 01 Complete 44 Cavendish Court 01 Complete 71 Raintree Drive 01 Complete
18 South Brick Road 08 Complete 45 Clouser Drive 01 Complete 72 Ramblewood Drive 11 Complete
19 Trinity Three Circle 01 Complete 46 Craven Arms Court 01 Complete 73 Regents Court 11 Complete
20 Trinity Three Court 01 Complete 47 Evelyn Court 02 Complete 74 Ridgetop Court 09 Complete
21 Trinity Three Road 01 Complete 48 Exton Shore Drive 11 Complete 75 Riverwalk Court 02 Complete
22 Upton Grey Court 01 Complete 49 Falbrook Court 01 Complete 76 Southhampton Dr 01 Complete
23 Upton Grey Road 01 Complete 50 Fincastle Avenue 10 Complete 77 Spring Hope Road 10 Complete
24 Wells Garden Court 01 Complete 51 Garland Street 10 Complete 78 Sugar Pine Court 09 Complete
25 Westport Drive 09 Complete 52 Gidding Court 01 Complete 79 Sutton Way 01 Complete
26 Anna B Lane 01 Complete 53 Gowham Court 01 Complete 80 Warly Court 07 Complete
27 Arborgate Court 02 Complete 54 Grantham Circle 01 Complete 81 Wheatstone 08 Complete
COST STATUS
PUBLIC STATUS – The project is substantially
completed. All roads have been inspected.
Activities since last period: The contractor has submitted the proper closeout documents.
Activities for next period: Closeout the project.
PHASE
*2020 Q2 ESTIMATE
EXPENDED TO DATE
Personnel
$380,000.00
$73,284.88
Util\Const.
$3,477,238.39
$3,048,300.54
Page 57
MONTHLY PROGRESS REPORT
RESURFACING PACKAGE “Q” - Project 770
SCOPE
Milling, full depth patching, and/or resurfacing of approximately 16.74 miles of roadway located within Richland County.
Project Length: 16.74 Mi
District: 02, 03, 07, 08, 09, 10, 11
PM: Rasheed Muwwakkil, Sr.
Construction: Palmetto Corp. of Conway
Name
District
Status Name
District
Status Name
District
Status
1 Almeda Drive 08 Complete 19 Hillvale Court 07 Complete 37 S Brighton Road 10 Complete
2 Ashley Brook Court 08 Complete 20 Hillvale Drive 07 Complete 38 Savannah Drive 07 Complete
3 Ashley Crest Drive 07 Complete 21 Holly Ridge Court 07 Complete 39 Shallow Brook Drive 09 Complete
4 Athena Drive 08 Complete 22 Holly Ridge Lane 07 Complete 40 Shallow Pond Road 08 Complete
5 Bombing Range Road 09 Package R 23 Humble Drive 08 Complete 41 Siegfried Lane 09 Complete
6 Bradbury Drive 07 Complete 24 Huntcliff Court 09 Complete 42 Sommerset Drive 08 Complete
7 Brickingham Way 08 Complete 25 Longtown Road W 07, 09 Package R 43 Springsdans Lane 09 Complete
8 Briercliff Drive 07 Package R 26 Lost Tree Drive 08 Complete 44 Sprott Street 03 Complete
9 Carriage House Road 08 Complete 27 Meadowlake Court 07 Complete 45 Stafford Road 10 Complete
10 Centeridge Drive 10 Complete 28 N Chateau Drive 08 Complete 46 Summer Vale Court 07 Complete
11 Clover Bay Drive 07 Complete 29 Norse Way 09 Complete 47 Tea Olive Road 09 Complete
12 Cokesbury Drive 03 Complete 30 Oakmist Way 02 Complete 48 Viking Drive 09 Complete
13 Columbia Club Drive E 09 Package R 31 Old Iron Road 10 Complete 49 Wales Road 03 Complete
14 Decker Boulevard 08 Complete 32 Olde Springs Road 07 Package R 50 Watson Way 09 Complete
15 Decker Park Road 08 Complete 33 Petworth Court 07 Complete 51 Whitehurst Way 07 Complete
16 Foxfield Lane 09 Complete 34 Petworth Drive 07 Complete 52 Woodlands Village 09 Complete
17 Glen Green Drive 07 Complete 35 Rockwood Road 11 Complete
18 Glenshire Drive 07 Complete 36 Rosewood Drive 10 Package R
* 6 roads moved to Resurfacing Package R
COST STATUS
PUBLIC STATUS – The project has been substantially
completed.
Activities since last period: The project is substantially completed. SCDOT has installed new traffic loops, and the contractor
will need to finish addressing final punchlist items.
Activities for next period: The Contractor will complete all of the punchlist items. After this is completed, the County will
close the project out.
PHASE
*2021 Q1 ESTIMATE
EXPENDED TO DATE
Personnel
$322,387.45
$15,098.75
Professional Srvs
$375,000.00
$375,000.00
Util\Const.
$4,341,103.87
$4,103,737.72
Page 58
January 2021
RESURFACING PACKAGE “R” - Project 783
SCOPE
Milling, full depth patching, and/or resurfacing of approximately 18.22 miles of roadway located within Richland County.
Project Length: 18.22 Mi
District: 01, 02, 07, 08, 09, 10, 11
PM: Ali Eliadorani
Name
District(s)
Status
Name
District(s)
Status
1. Ashleys Place 11 Construction Phase 27. Muirfield Court W 09 Construction Phase
2. Averill Lane 01 Construction Phase 28. Northpoint Blvd 02 Construction Phase
3. Bedford Way 11 Construction Phase 29. Oak Knoll Drive 02 Construction Phase
4. Belk Court 02 Construction Phase 30. Olde Springs Rd. 07 Construction Phase
5. Bent Oak Court 07 Construction Phase 31. Osbourne Lane 01 Construction Phase
6. Berkeley Forest Court 11 Construction Phase 32. Padgett Woods Blvd 11 Construction Phase
7. Berkeley Forest Drive 11 Construction Phase 33. Pear Tree Circle 11 Construction Phase
8. Bombing Range Rd 01 Construction Phase 34. Prince Charles Lane 11 Construction Phase
9. Briercliff Dr 09 Construction Phase 35. Radcot Court 08 Construction Phase
10. Bucktail Way 01 Construction Phase 36. Ragsdale Drive 11 Construction Phase
11. Candlewood Drive 11 Construction Phase 37. Raintree Court 11 Construction Phase
12. Cardington Drive 11 Construction Phase 38. Raintree Lane 11 Construction Phase
13. Carolina Pines Drive 02 Construction Phase 39. Ramblewood Drive 11 Construction Phase
14. Columbia Club Dr E 09 Construction Phase 40. Redington Way 01 Construction Phase
15. Exton Shore Drive 11 Construction Phase 41. Regents Court 11 Construction Phase
16. Flowerwood Drive 11 Construction Phase 42. Salusbury Lane 08 Construction Phase
17. Garner Lane 01 Construction Phase 43. Staffwood Court 01 Construction Phase
18. Greys Court 11 Construction Phase 44. Staffwood Drive 01 Construction Phase
19. Harper Park Road 02 Construction Phase 45. S. Royal Tower Dr 01 Construction Phase
20. Jadetree Court 11 Construction Phase 46. Stonemeade Drive 01 Construction Phase
21. Jadetree Drive 08 Construction Phase 47. Ventura Court 08 Construction Phase
22. Kildare Drive 11 Construction Phase 48. W. Royal Tower Dr 01 Construction Phase
23. Kip Court 02 Construction Phase 49. Winding Creek Lane 08 Construction Phase
24. Little Hamilton Road 11 Construction Phase 50. Woodlands West 09 Construction Phase
25. Longtown Road w 07,09 Construction Phase 51. Wycliff Court 01 Construction Phase
26. Mountainbrook Drive 11 Construction Phase 52. Rosewood Dr. 10 Construction Phase
Page 59
MONTHLY PROGRESS REPORT
COST STATUS
PUBLIC STATUS – This project has been advertised, and bids have been received.
Activities since last period: Award of this contract to Palmetto Corp. of Conway will go to Committee for approval on 2/23.
Activities for next period: After Committee approval this will go to Council approval on 3/2.
PHASE
*2020 Q4 ESTIMATE
EXPENDED TO DATE
Personnel
$10,000.00
Util\Const.
$5,493,804.00
$0.00
Page 60
January 2021
Widening
P
r
o
j
e
c
t
C
o
u
n
t
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
425
Bluff Rd Widening Phase 1
1
0.50
10
$7,752,371.79
$9,724,497.79
Aug-2017
Widening Total
1
0.50
$7,752,371.79
$9,724,497.79
COMPLETED PROJECTS
Intersection
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
292
Broad River Rd. and Rushmore Rd. Intersection
1
02
$3,700,000.00
$1,196,893.20
Jul-2016
294
Clemson Rd. and Rhame Rd./North Springs Rd. Intersection
1
08, 09
$3,500,000.00
$3,852,225.29
Aug-2017
296
Farrow Rd. and Pisgah Church Rd. Intersection
1
07
$3,600,000.00
$2,068,722.09
Jul-2018
299
Kennerly Rd. and Coogler Rd./Steeple Ridge Rd. Intersection
1
01
$1,900,000.00
$2,598,628.78
Dec-2016
302
North Springs Rd. and Risdon Way Intersection
1
08, 09
$1,800,000.00
$1,883,942.69
Dec-2016
304
Summit Pkwy and Summit Ridge Dr Intersection
1
08, 09
$500,000.00
$1,407,818.76
Jul-2016
305
Wilson Blvd. and Killian Rd. Intersection
1
07
$2,600,000.00
$404.80
306 Wilson Blvd. and Pisgah Church Rd. Intersection 1 07 $3,600,000.00 $404.81
Intersection Total 8 0 $21,200,000.00 $13,009,040.42
Special
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
289
Riverbanks Zoo Transportation-Related Projects 1
1
05
$4,000,000.00
$3,345,525.21
Aug-2016
290
Shop Road Extension Phase 1
1
1.00
10
$71,800,000.00
$32,446,865.66
Jul-2019
Special Total
2
1.00
$75,800,000.00
$35,792,390.87
Neighborhood Improvement
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
327
Candlewood Neighborhood Improvements
3
$1,850,000.00
$947,956.52
June-2020
759
Athena Drive Sidewalk (Harrington Dr. to Arcola Dr.)
1
0.06
08
761
Green Springs Drive Sidewalk (Arcola Dr. to Seton Hall Dr.)
1
0.45
08
762
Harrington Drive Sidewalk (North Springs Rd. to Athena Dr.)
1
0.44
08
325
Broad River Rd. NIP
4
0.90
04
$753,154.65
May 2020
Neighborhood Improvement Total
3
0.95
$63,000,000.0
0
$1,701,111.17
Innovista
Project
Length
District
Referendum
1
Expended
2
Substantial
Count
(miles)
Completion
319
Innovista Transportation Related Projects 1 - Greene Street
1
0.70
05
$18,200,000.00
$17,897,970.34
Dec-2016
Page 61
MONTHLY PROGRESS REPORT
Phase 1
Innovista Total 1 0.70 $18,200,000.00 $17,897,970.34
Greenway
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
139
Lincoln Tunnel Greenway
1
0.60
04, 05
$892,739.00
$1,512,060.93
Jul-2016
Greenway Total
1
0.60
$892,739.00
$1,512,060.93
Sidewalk
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
413
2015 Sidewalk Package "S1"
2
0.24
$452,391.00
$143,492.06
May-2016
194
Wildwood Ave Sidewalk (Monticello Rd to Ridgewood Ave)
0.14
04
196
Windover St Sidewalk (Two Notch Rd to Belvedere Dr)
0.10
03
414
2015 Sidewalk Package "S2"
2
0.14
$284,038.00
$194,348.71
Aug-2016
174
Maple St Sidewalk (Kirby St to Gervais St)
0.06
06
175
Mildred Ave Sidewalk (Westwood Ave to Duke Ave)
0.08
04
415
2015 Sidewalk Package "S3"
2
0.43
$1,166,827.00
$313,136.25
Jul-2017
160
Franklin St Sidewalk (Bull St to N. Main St)
0.30
04
166
Jefferson St Sidewalk (Bull St to Marion St)
0.13
04
441
2015 Sidewalk Package "S4"
1
0.16
$280,896.00
$97,372.71
Aug-2016
195
Wiley St Sidewalk (Superior St to Edisto Ave)
0.16
10
420
Previously Completed Sidewalk Projects
15
4.63
$4,840,750.00
148
Blossom St Sidewalk (Williams St to Huger St)
0.10
05
149
Blythewood Rd Sidewalk (I-77 to Main St)
0.54
02
151
Broad River Rd Sidewalk (Greystone Blvd to Broad River Bridge)
0.48
04, 05
154
Calhoun St Sidewalk (Gadsden St to Wayne St)
0.10
04
157
Colonial Dr Sidewalk (Harden St to Academy St)
0.37
04
158
Columbiana Dr Sidewalk (Lex. County Line to Lake Murray Blvd)
0.98
02
161
Gervais St Sidewalk (450' west of Gist St to Gist St)
0.05
05
162
Gervais St Sidewalk (Gist St to Huger St)
0.19
05
168
Laurel St Sidewalk (Gadsden St to Pulaski St)
0.20
04, 05
170
Lincoln St Sidewalk (Heyward St to Whaley St)
0.11
05
172
Lyon St Sidewalk (Gervais St to Washington St)
0.21
05
179
Pinehurst Sidewalk (Harrison Road to Forest Drive)
0.70
03
191
Veterans Sidewalk (Coachmaker Road to Coatsdale Road)
0.06
06, 11
192
Veterans Sidewalk (Garners Ferry Rd to Wormwood Dr)
0.34
11
193
Wayne St Sidewalk (Calhoun St to Laurel St)
0.20
04, 05
Page 62
January 2021
442
Sidewalk Package "S5"
1
0.26
$476,230.00
$133,538.98
Mar-2017
184
Senate St Sidewalk (Gladden St to Kings St)
0.26
05, 06
589
Sidewalk Package “S6"
2
0.73
$1,311,340.00
$673,453.30
Oct-2020
Magnolia St Sidewalk
0.44
03
School House Rd. Sidewalk
0.29
03
718
Sidewalk Package "S7"
3
0.75
$1,880,076.00
$181,606.42
Nov-2018
150
Bratton St Sidewalk (King St to Fairview (previously to Maple))
0.15
05
163
Grand St Sidewalk (Shealy St to Hydrick St)
0.46
04
188
Marion St Sidewalk (Dreher to Crestwood - previously
Heyward/Marion/Superior/Holt)
0.14
05, 10
745
Sidewalk Package "S8"
2
0.16
$701,220.00
$113,209.52
Feb-2019
177
Pelham Dr Sidewalk (Gills Creek Parkway to Garners Ferry Rd)
0.09
06
189
Tryon St Sidewalk (Catawba St to Heyward St)
0.07
05
766
Sidewalk Package "S9"
1
0.33
$92,891.00
$193,406.14
Jul-2019
167
Koon Road Sidewalk (Malinda Road to Farmview Street)
0.33
03
182
Capers Ave Sidewalk (S. Ravenel to S. Ott)(previously Royster St )
1
0.11
05
$95,357.00
$58,038.81
Feb-2019
Sidewalk Total
30
7.21
$10,270,676.00
$1,428,149.60
Bikeway
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
266 Two Notch Rd Bikeways (Head St to Albritton Rd - previously
Beltline to Parklane)
252 O’Neil Court Bikeway
1
1
3.50
1.35
03
03, 08
$2,435,039.00
$85,675.00
421 Previously Completed Bikeway Projects
5
1.93
$393,706.00
206 Blossom St Bikeways (Williams St to Huger St)
0.10
05
238 Greene St Bikeways (Assembly St to 350' west of Lincoln St)
0.27
05
250 Main St Bikeways (Elmwood Ave to Sunset Dr)
1.20
04
270 Wheat St Bikeways (Sumter St to Assembly St) 0.19 05
Bikeway Total 7
6.
$2,914,420.00
$0.00
Pedestrian Improvement
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
106 Broad River Rd and Bush River Rd Pedestrian Improvements
1
04, 05
$94,536.00
107 Devine St and Harden St/Santee Ave Pedestrian
Improvements
1
05
$94,536.00
108 Elmwood Ave and Bull St Pedestrian Improvements
1
04
$94,536.00
110 Harden St and Gervais St Pedestrian Improvements
1
04, 05
$94,536.00
111 Huger St and Blossom St Pedestrian Improvements
1
05
$94,536.00
Page 63
MONTHLY PROGRESS REPORT
112 Huger St and Gervais St Pedestrian Improvements
1
05
$94,536.00
113 Huger St and Greene St Pedestrian Improvements
1
05
$94,536.00
114 Huger St and Lady St Pedestrian Improvements
1
05
$94,536.00
117 Main St and Elmwood Ave Pedestrian Improvements
1
04
$94,536.00
122
Rosewood Dr and Kilbourne Rd Pedestrian Improvements
1
05, 06
$94,536.00
126
Two Notch Rd and Alpine Rd Pedestrian Improvements
1
03, 07
$94,536.00
767
Pedestrian Improvement Projects
16
$1,512,576.00
$580,894.52
Aug-2019
101
Assembly St and Calhoun St Pedestrian Improvements
1
04
102
Assembly St and Gervais St Pedestrian Improvements
1
04, 05
103
Assembly St and Laurel St Pedestrian Improvements
1
04
104
Assembly St and Washington St Pedestrian Improvements
1
04, 05
105
Blossom St and Saluda Ave Pedestrian Improvements
1
05
109
Elmwood Ave and Park St Pedestrian Improvements
1
04
116
Main St and Calhoun St Pedestrian Improvements
1
04
119
Rosewood Dr and Beltline Blvd Pedestrian Improvements
1
05, 06
120
Rosewood Dr and Harden St Pedestrian Improvements
1
05
121
Rosewood Dr and Holly St Pedestrian Improvements
1
05
123
Rosewood Dr and Marion St Pedestrian Improvements
1
05, 10
124
Rosewood Dr and Ott Rd Pedestrian Improvements
1
05
125
Rosewood Dr and Pickens St Pedestrian Improvements
1
05, 10
127
Two Notch Rd and Brickyard Rd Pedestrian Improvements
1
08, 09
129
Two Notch Rd and Maingate Dr/Windsor Lake Blvd Pedestrian
Improvements
1
03
130
Two Notch Rd and Sparkleberry Ln Pedestrian Improvements
1
09
Pedestrian Improvement Total
28
0
$2,647,008.00
$580,894.52
Dirt Road
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
2014 Dirt Road Paving Package "B"
10
2.51
$1,192,901.01
Nov-2014
333 Ethels Avenue
0.20
07
334 Harold Street
0.26
07
335 India Street
0.25
07
337 Peafowl Road
0.19
07
Page 64
January 2021
336 Pilgrim Road
0.47
07
338 Prestley Drive
0.24
07
339 Tammy Drive
0.09
07
340 Ted Street
0.17
07
341
Townsend Street
0.04
07
342
William Duffie Road
0.60
07
316
2014 Dirt Road Paving Package "C"
12
1.68
$1,380,537.72
Jan-2015
348
Annie Entzminger Court
0.13
02
344
Cedar Grove Lane
0.30
01
350
Cheek Street
0.07
09
349
Christy Creek Court
0.15
11
351
Clayton Street
0.14
09
345
Cliff Anderson Road
0.05
02
352
Griggs Street
0.07
09
353
Polk Street
0.07
09
354
Sarah Road
0.14
09
343
Tiger Paw Lane
0.18
01
347
Winterwood Court
0.25
02
346
Zachary Lane
0.13
02
312
2014 Dirt Road Paving Package "D"
3
1.22
$999,637.05
Jan-2015
360
Boylston Road
0.34
07
358
Dunes Point
0.08
09
359
Overlook Drive
0.80
07, 09
314
2014 Dirt Road Paving Package "E"
5
0.72
$626,908.98
Jul-2015
432
Kirk Road
0.10
10
361
Pleasant Grove Lane
0.14
10
362
PR Webber Road
0.22
10
363
Simon Weston Road
0.13
10
364
Sumpter Road
0.13
10
431
2015 Dirt Road Paving Package "F" (Jouster St.)
1
0.12
$166,004.01
Jun-2016
795
Jouster St
0.12
09
658
Transportation Improvement Contract 1
15
1.66
$2,398,494.01
Feb-2019
659
Amenity Ct Dirt Road Paving
0.07
1
660
Archer Ave Dirt Road Paving
0.38
9
662
Cabin Cove Rd Dirt Road Paving
0.04
1
664
Deloach Dr Dirt Road Paving
0.07
11
Page 65
MONTHLY PROGRESS REPORT
665
Hattie Rd Dirt Road Paving
0.08
7
667
Miller Rd Dirt Road Paving
0.04
1
669
Nassau Dr Dirt Road Paving
0.13
9
670
Normandy Rd Dirt Road Paving
0.04
5
671
Paul Rd Dirt Road Paving
0.1
2
672
Pringle Rd Dirt Road Paving
0.08
11
674
Shady Grove Church Rd Dirt Road Paving
0.08
1
675
Tuck Ct Dirt Road Paving
0.23
9
676
Tucker Town Ct Dirt Road Paving
0.06
10
677
Westchester Ave Dirt Road Paving
0.21
9
588
Dirt Road Paving Package “G”
3
0.59
$750,293.14
663
Della Mae Court
0.26
02
849
La Brew Drive
0.06
02
London Avenue
0.27
02
719
Dirt Road Paving Package “H”
4
0.54
$810,234.96
668
Minger Road
0.30
02
852
W Miriam Avenue
0.02
04
853
S Hask Jacobs Road
0.15
07
Net Dean Road
0.07
10
719
Dirt Road Paving Package “I”
7
1.23
$838,678.37
699
Amick Dr
0.04
01
704
Julian Addy Cir
0.10
01
789
Howard Coogler Rd
0.54
01
807
Manus Rd
0.08
01
838
SE Sedgewood Rd
0.13
11
Cadia Dr
0.16
03
Meadow Ln
0.19
11
771
Dirt Road Paving Package “J”
1
0.03
$51,947.28
pending
777
Hall St
0.03
03
Dirt Road Total
57
9.62
$0.00
$8,424,046.51
Page 66
January 2021
Resurfacing
Project
Count
Length
(miles)
District
Referendum
1
Expended
2
Substantial
Completion
313
2014 Resurfacing Package "A"
14
4.83
$1,379,767.10
Jun-2015
370
Brookview Lane
0.20
01
377
Chelveston Drive
0.11
02
368
Cheryse Court
0.16
01
374
Concord Place Road
0.76
01
376
Market Hall Court
0.08
01
369
Murray Point Lane
0.14
01
366
Muskrat Run
0.52
01
367
Silver Fox Lane
0.64
01
365
South Royal Tower Drive
0.27
01
378
Southern Drive
0.18
10
371
St. Albans Road
0.60
01
372
St. Stephens East
0.05
01
373
St. Stephens West
0.06
01
375
Sweet Thorne Road
1.06
01
315
2014 Resurfacing Package "B"
16
6.10
$1,677,016.94
Jun-2015
389
American Italian Way
0.85
10
384
Arcola Drive
0.56
08
392
Beaver Dam Road
0.73
09
386
Constable Lane
0.08
08
382
Harrington Drive
0.44
08
381
Harvest Hill Avenue
0.07
10
387
Hibernia Street
0.07
08
385
Inway Drive
0.43
08
390
Quaker Road
0.24
10
437
Roundtree Road
0.40
07
391
Sagemont Drive
0.46
10
383
Splendora Drive
0.13
08
587
Valhalla Court
0.02
09
379
Windmill Orchard Road
0.19
09
380
Windridge Road
0.19
09
388
Wotan Road
1.24
09
320
2014 Resurfacing Package "C"
15
2.36
$1,490,665.17
Dec-2015
407
Baker House Court
0.03
07
Page 67
MONTHLY PROGRESS REPORT
401
Baker House Road
0.17
07
404
Blakesmoor Road
0.17
07
405
Calley Court
0.03
07
398
Claey Court
0.02
07
397
Finn Court
0.04
07
395
Firebridge Road
0.21
07
396
Gale River Road
0.14
07
394
Great North Road
0.71
07
402
Halton Court
0.11
07
400
King Maker Court
0.06
07
403
South Shields Road
0.20
07
393
Trader Mill Road
0.43
07
406
Tweed Court
0.02
07
586
2016 Resurfacing Package "H"
125
23.41
$6,650,809.28
Nov-2017
470
Abberton Court
0.04
07
471
Ashbourne Road
0.17
01
472
Baldur Court
0.10
09
473
Beckton Court
0.07
07
474
Brookwood Drive
0.40
10
475
Business Park Boulevard
0.37
07
476
Camino Court
0.08
10
477
Cape Lookout Court
0.08
02
478
Chanwood Court
0.27
11
479
Chanwood Drive
0.44
11
480
Charles Towne Court
0.36
11
481
Chimneyridge Drive
0.17
10
482
Chukker Hill Court
0.02
09
483
Cockspur Road
0.22
01
484
Columbia Ave
0.21
02
485
Commerce Drive NE
0.24
03
486
Corby Court
0.03
07
487
Cowdray Park
0.20
09
488
Craigwood Drive
0.42
09
489
Cranley Court
0.02
07
490
Cranley Road
0.25
07
Page 68
January 2021
491
Creekfield Court
0.06
07
492
Crown Point Court
0.12
02
493
Denbeck Road
0.24
01
494
Doncaster Drive
0.56
01
495
Durham Creek Court
0.14
07
496
Esther Circle
0.02
07
497
Fairfield Park Road
0.09
07
498
Finley Road
0.21
07
499
Flagbury Road
0.06
01
500
Fontaine Center Drive
0.30
03
501
Foxwood Knl
0.08
09
502
Freya Court
0.03
09
503
Green Rose Road
0.12
07
504
Green Springs Circle
0.04
08
505
Green Springs Court
0.18
08
585
Greengate Court
0.02
03
586
Greengate Drive
0.31
03
506
Grinders Mill Road
0.25
07
507
Gristmill Court
0.09
07
508
Halling Court
0.04
09
509
Halling Drive
0.34
09
510
Hamilton Drive
0.36
07
511
Hexham Circle
0.17
01
512
Hurlingham Drive
0.16
09
513
Kelly Court
0.04
07
514
Lansing Circle
0.26
07
515
Lee Hills Drive
0.29
11
516
Leila Lane
0.11
07
517
Lindevon Lane
0.07
07
518
Locklier Road
0.17
07
590
Loki Court
0.05
09
519
Lowescroft Circle
0.15
01
587
Maingate Drive
0.25
03
520
Midgard Court
0.02
09
521
Millhouse Circle
0.02
07
522
Millhouse Court
0.16
07
Page 69
MONTHLY PROGRESS REPORT
523
Millstone Court
0.09
07
524
Millwood Court
0.08
11
525
Millwood Drive
0.62
11
526
Moss Field Court
0.03
07
527
Moss Field Road
0.23
07
528
Mountain Laurel Court
0.13
08
529
Mountain Laurel Lane.
0.16
08
531
N Donar Court
0.05
09
532
N Donar Drive
0.96
09
533
N Highland Forest Drive
0.47
07
534
Newworth Court
0.08
07
591
Norse Drive
0.17
09
535
Northbrown Court
0.03
10
536
Northbrown Road
0.09
10
537
Northfield Court
0.07
07
538
Oak Brook Court
0.04
09
539
Oak Brook Drive
0.66
09
540
Oakleaf Road
0.24
08
541
Odin Court
0.05
09
542
Ola Street
0.05
07
543
Ouida Street
0.10
03
544
Paddock Place
0.03
09
545
Penelope Lane
0.12
07
546
Pioneers Point Court
0.09
02
547
Pond Ridge Road E
0.21
09
548
Ralph Court
0.07
07
549
Roxann Drive
0.05
03
550
Runneymede Court
0.03
09
551
Runneymede Drive
0.07
09
552
Saddleback Ledge Court
0.09
02
553
Saddletrail Road
0.32
07
554
Saint Albans Court
0.07
01
555
Settlers Way
0.10
02
556
Sheridan Drive
0.34
08
557
Shetford Road
0.25
01
Page 70
January 2021
558
Smithfield Road
0.23
03
559
Split Rock Court
0.08
02
560
Springwoods Lake Drive
0.17
07
561
Springwoods Lake Point
0.14
07
562
Stanford Ridge Court
0.07
01
563
Stockport Road
0.16
07
588
Stonegate Drive
0.36
03
564
Surfwood Drive
0.24
10
565
Sweet Thorne Circle
0.48
01
566
Sweet Thorne Court
0.09
01
567
Tea Rose Court
0.06
08
568
Thornfield Court
0.03
07
569
Thornfield Road
0.35
07
570
Thornridge Road
0.06
09
571
Timber Knoll Drive
0.40
01
572
Tomafield Court
0.04
07
593
Valhalla Circle
0.25
09
594
Valhalla Drive
1.66
09
592
Valkyrie Blvd
0.27
09
573
Valley End Court
0.03
07
574
Wallbrook Court
0.06
01
575
Watts Lane
0.23
07
576
Wayland Court
0.05
09
577
Whiteoak Ridge Road
0.17
07
578
Wildewood Club Court
0.11
09
579
Willow Bend Court
0.03
09
580
Winslow Court
0.16
07
581
Winslow Way
0.79
07
589
Woodgate Drive
0.11
03
582
Woodshore Circle
0.06
08
583
Woodshore Court
0.04
08
584
Woodshore Drive
0.41
08
408
Pavement Management System
1
ALL
$473,079.92
Jul-2015
597
Resurfacing Package "I"
9
1.73
$1,016,782.77
Nov-2017
444
Brickling Road
0.46
01
446
Cotswold Court
0.04
01
Page 71
MONTHLY PROGRESS REPORT
447
Cove Court
0.07
01
448
Cove View Drive
0.16
01
452
Hayburg Drive
0.14
01
453
Headwater Circle
0.27
01
465
Shell Cracker Court
0.04
01
468
Wells Point Drive
0.19
01
469
Wychwood Road
0.36
01
443
Avocet Court
0.10
02
449
Egret Court
0.06
02
454
Heron Court
0.01
02
455
Heron Drive
0.62
02
460
Merganser Court
0.05
02
463
Peregrine Court
0.06
02
464
Plover Court
0.07
02
467
Swallow Court
0.07
02
599
Resurfacing Package "K"
8
0.98
$549,839.64
Nov-2017
450
Golden Court
0.02
07
451
Golden Oak Circle
0.03
07
456
Leaf Circle
0.04
07
457
Lincolnshire Boulevard
0.12
07
458
Lincolnshire Court
0.07
07
459
Meadowlake Drive
0.65
07
462
Oak Timber Circle
0.03
07
466
Silver Oak Circle
0.02
07
596
Resurfacing Package "M"
57
10.28
$2,805,724.19
Nov-2018
601
Addy Court
0.05
07
602
Aiken Hunt Circle
0.98
09
603
Avenel Court
0.03
09
604
Balfour Court
0.06
07
605
Brafield Place
0.21
01, 02
606
Brookline Court
0.03
09
607
Bucktail Drive
0.14
01
608
Chasewood Court
0.07
07
609
Clay Court
0.03
01
610
Clearidge Court
0.03
07
Page 72
January 2021
611
Clearwell Court
0.04
07
612
Darcy Court
0.03
02
613
Den Hague Court
0.05
09
614
Deuce Court
0.06
01
615
Doral Court
0.03
09
616
Elton Court
0.04
07
617
Fawnwood Court
0.07
07
618
Firestone Court
0.03
09
619
Forty Love Point
0.55
01
620
Glen Ridge Court
0.10
01
621
Gleneagle Circle (NE section)
0.63
01
622
Glenhawk Loop
0.26
01
623
Green Rose Road
0.81
07
624
Kenmure Court
0.03
09
625
Lancer Court
0.07
07
626
Lionburg Court
0.02
07
627
Marway Court
0.02
01
628
Match Point Drive
0.31
01
629
Meadow Creek Drive
0.17
07
630
Misty Glen Court
0.11
01
631
Newcourt Place
0.04
07
632
North Crossing Court
0.06
09
633
North Crossing Drive
0.15
09
634
Persimmon Wood Court
0.19
01
635
Pintail Lane
0.11
09
636
Pond Edge Lane
0.10
01
637
Racket Road
0.29
01
638
Riverwalk Way
0.26
01, 02
639
Ruthberry Court
0.07
07
640
Sagamare Road
0.20
07
641
Sawgrass Court
0.03
09
642
Set Point Court
0.04
01
643
Spyglass Court
0.08
09
644
Staffwood Drive
0.54
01
645
Stamhope Court
0.14
07
646
Teal Way
0.08
09
Page 73
MONTHLY PROGRESS REPORT
647
Tennis Court
0.07
01
648
Tillbury Drive
0.10
07
649
Tipton Circle
0.06
01
650
Toms Chase Road
0.12
09
651
Torwood Drive
1.02
07
652
Touchfield Court
0.08
07
653
Ultra Way
0.11
01
655
Windward Court
0.03
07
656
Woodlands Ridge Road
0.37
09
657
Yorkton Court
0.08
07
764
Resurfacing Package "O"
39
4.57
$1,264,981.11
Nov-2019
822
Baying Hound Way
0.09
09
823
Berry Ridge Court
0.05
08
839
Brook Hollow Drive
0.40
08
824
Carty Drive
0.22
07
825
Charring Drive
0.06
07
826
Coland Court
0.09
07
827
Fair Oaks Drive
0.05
07
828
Fenwick Court
0.06
08
829
Firebrick Lane
0.10
10
830
Fonthill Court
0.06
09
831
Gateway Corporate Blvd
0.10
07
832
Gyle Court
0.08
07
833
Harwell Drive
0.29
09
834
Joye Circle
0.04
08
835
Larry Court
0.05
07
836
Loblolly Drive
0.05
07
837
Lost Trees Court
0.04
08
838
Maple Ridge Road
0.45
07
840
Muirfield Court West
0.18
09
841
Oak Forest Circle
0.08
07
842
Pembury Court
0.03
07
843
Portchester Court
0.03
07
844
Radcot Court
0.06
08
845
Salusbury Lane
0.34
08
Page 74
January 2021
846
Sly Fox Run
0.08
09
847
Springtree Road
0.11
07
848
Sprucewood Lane
0.03
07
849
Staffort Court
0.03
10
850
Summer Vale Drive
0.24
07
851
Surrey Lane
0.06
08
852
Sutter Mills Court
0.06
10
853
Twin Eagles Drive
0.32
07
854
Ventura Court
0.13
08
855
Ward Court
0.03
03
856
Wheatridge Court
0.09
08
857
Whiteoak Ridge Lane
0.04
07
858
Whitfield Court
0.17
07
859
Winding Creek Lane
0.11
08
860
Woodlands Ridge Lane
0.07
09
658
Transportation Improvement Contract 1
21
6.73
$2,838,162.46
Feb-2019
678
Arborgate Circle Resurfacing
0.36
02
679
Beatty Downs Road Resurfacing
0.13
02
680
Bentwood Court Resurfacing
0.06
09
681
Calico Circle Resurfacing
0.31
02
682
Calico Lane Resurfacing
0.74
02
445
Cedar Lake Road Resurfacing
0.19
07
684
Frontier Road Resurfacing
0.32
02
685
Gatlin Court Resurfacing
0.04
11
686
Gatlin Drive Resurfacing
0.44
11
687
Harwood Drive Resurfacing
0.20
11
688
Hickory Ridge Drive Resurfacing
0.59
10
689
Irish Court Resurfacing
0.04
07
461
Montreat Court Resurfacing
0.06
11
690
Old Well Road Resurfacing
0.91
01
691
Padgett Road Resurfacing
0.23
11
692
Parkingson Drive Resurfacing
0.18
03
693
Powers Court Resurfacing
0.06
11
694
Sherry Court Resurfacing
0.04
03
695
Stoopwood Court Resurfacing
0.03
02
696
Summit Parkway Resurfacing
1.24
08
Page 75
MONTHLY PROGRESS REPORT
697
W Ashford Way Resurfacing
0.56
01
765
Resurfacing Package “P”
1
0.12
$721,482.97
698
W Ashford Court
0.12
01
Resurfacing Total
314
62.15
$0.00
$21,413,299.94
Completed Projects 452 89.51 $141,527,214.79 $110,602,020.92
1
"Expended" amounts are expenditures to date and may not indicate final cost at project close-out.
2
The contractor may continue to finalize minor project details beyond the date of substantial completion.
RIGHT-OF-WAY ACQUISITION SUMMARY
Project Total Tracts Offers Made
Tracts
Acquired
Condem-
nations Relocations % Complete
Widenin
271
g
Atlas Rd Widening
147
110
147
30
0
99%
425
Bluff Rd Widening Phase 1
12
9
8
4
0
100%
273
Blythewood Rd Widening (Syrup Mill Road to I-77)
22
22
15
7
0
95%
276
Clemson Rd Widening
27
25
25
2
0
100%
280
North Main Street Widening
97
69
76
20
1
100%
283
Shop Rd Widening (R/W stopped per County Direction)
39
39
5
0
0
13%
Intersection
293
Bull Street and Elmwood Avenue Intersection
8
3
7
0
0
88%
297
Garners Ferry Road and Harmon Road Intersection
4
4
4
0
0
100%
301
N. Springs Road and Harrington Road Intersection
11
5
11
0
0
100%
303
Screaming Eagle Road and Percival Road Intersection
6
2
6
0
0
100%
295
Clemson Road/Sparkleberry Lane Intersection (early acquisition)
1
1
1
0
0
100%
292
Broad River Rd. and Rushmore Rd. Intersection
2
2
2
0
0
100%
296
Farrow Rd. and Pisgah Church Rd. Intersection
3
3
2
1
0
100%
299
Kennerly Rd. and Coogler Rd./Steeple Ridge Rd. Intersection
7
7
4
3
0
100%
302
North Springs Rd. and Risdon Way Intersection
8
304
Summit Pkwy and Summit Ridge Dr Intersection
294
Clemson Rd. and Rhame Rd./North Springs Rd. Intersection
18
5
100%
Page 76
January 2021
Greenway
144
Three Rivers Greenway Extension Ph. 1
1
1
1
0
0
100%
Special
290
Shop Road Extension Phase 1
10
8
9
1
0
100%
Innovista
321
Innovista Transportation Related Projects 2 - Greene Street Phase 2
20
8
20
0
1
90%
Neighborhood Improvement
325
Broad River Neighborhood Improvements
1
0
1
0
0
100%
326
Decker Blvd/Woodfield Park Neighborhood Improvements
5
0
5
0
0
100%
318
Southeast Richland Neighborhood Improvements
19
18
19
1
0
100%
Sidewalk
178
Percival Road Sidewalk (Forest Drive to Northshore Road)
3
0
0
0
0
0%
164
Harrison Road Sidewalk (Two Notch Road to Forest Drive)
20
14
20
0
0
100%
180
Polo Rd Sidewalk (Mallet Hill Road to Alpine Road)
7
7
7
0
0
100%
595
Clemson Road Sidewalk (Frontage Road to Percival Road)
1
0
1
0
0
100%
595
Two Notch Road Sidewalk (Lionsgate to Pine Springs)
5
0
5
0
0
100%
167
Koon Road Sidewalk (Malinda Road to Farmview Street)
2
0
2
0
0
100%
412
Alpine Road Sidewalk (Two Notch Rd to Percival Rd)
5
4
5
0
0
100%
160
Franklin Street Sidewalk
187
Sunset Drive Sidewalk (Elmhurst Road to River Drive)
17
3
16
0
0
94%
183
School House Road Sidewalk
1
1
1
0
0
100%
Total
524
362
426
73
2
Page 96
January 2021
UTILITY SUMMARY (active projects)
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
146 - Alpine Rd Sidewalk (Two Notch Rd to Percival Rd)
% CE Place Holder
240,929
240,929
-240,929
AT&T-D
Charter/ TWC/ Spectrum
City of Columbia - Water
East Richland County Public
Servce District (ERCPSD)
No
NCL
SCE&G - Distribution
SCE&G Gas
Spirit Communications
240,929
240,929
-240,929
271 - Atlas Rd Widening
AT&T-D
Yes
UAF
10/24/16
100,000
100,000
-100,000
AT&T-D
No
NCL
1,000,000
1,000,000
-1,000,000
AT&T-T
No
NCL
CenturyLink
No
NCL
Charter/ TWC/ Spectrum
No
NCL
City of Columbia - Sewer
172,500
172,500
345,000
-345,000
City of Columbia - Water
Yes
UAF
2,657,938
2,657,938
5,315,876
-5,315,876
Level 3/ CenturyLink
MCI
No
NCF
SCDOT - Traffic Signal
No
NCL
SCE&G - Distribution
Yes
UAF
2,769,293
2,769,293
-2,769,293
SCE&G - Transmission
Yes
NCF
SCE&G Gas
No
NCL
Spirit Communications
No
NCL
TWC/Spectrum (Now Charter)
No
NCL
5,699,731
3,830,438
9,530,169
-9,530,169
272 - Bluff Road Phase 2 Improvements
AT&T-D
No
NCL
AT&T-D
No
UAF
Charter/ TWC/ Spectrum
No
UAF
City of Columbia - Sewer
No
NCL
382,950
382,950
765,900
-765,900
City of Columbia - Water
Yes
UAF
1,293,146
1,293,146
2,586,293
-2,586,293
East Richland County Public
Servce District (ERCPSD)
No
UAF
Level 3/ CenturyLink
No
NCL
SCDOT - Fiber
Yes
UAF
SCDOT - Traffic Signal
Yes
UAF
SCE&G - Distribution
No
UAF
1,200,000
300,000
1,500,000
-1,500,000
SCE&G - Transmission
No
UAF
97 | P a g e
* Form Types: NCL = No Cost Letter, NCF = No Conflict Letter, UAF = Utility Agreement Form, EF = Encroachment Form
MONTHLY PROGRESS REPORT
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
SCE&G Gas
No
NCL
Spirit Communications
No
NCL
University of South Carolina
No
UAF
2,876,096
1,976,096
4,852,193
-4,852,193
273 - Blythewood Rd Widening (Syrup Mill Road to I-77)
% CE Place Holder
AT&T-D
No
UAF
Fairfield Electric Cooperative -
Blythewood
No
UAF
350,000
350,000
-350,000
Fairfield/Truvista
Communications
No
UAF
75,000
75,000
-75,000
NI America (Palmetto Utilities)
No
UAF
Richland School District Two
No
NCL
SCE&G Gas
No
UAF
Town of Winnsboro
No
UAF
75,000
75,000
-75,000
TWC/Spectrum (Now Charter)
No
UAF
500,000
500,000
-500,000
325 - Broad River Neighborhood Improvements
% CE Place Holder
5,000
5,000
-5,000
AT&T-D
Charter/ TWC/ Spectrum
City of Columbia - Sewer
City of Columbia - Water
SCE&G - Distribution
No
NCL
07/01/16
5,000
5,000
-5,000
SCE&G Gas
No
UAF
07/01/16
SCE&G Gas High Pressure
5,000
5,000
10,000
-10,000
275 - Broad River Rd Widening
AT&T-D
Yes
UAF
City of Columbia - Water
Yes
UAF
1,620,300
1,620,300
3,240,600
-3,240,600
Level 3/ CenturyLink
No
NCL
Mid-Carolina Electric
Cooperative
Yes
UAF
1,347,500
1,347,500
2,695,000
-2,695,000
PBT Telecom (Comporium)
No
NCL
Richland County Utilities - Sewer
No
UAF
808,500
808,500
1,617,000
-1,617,000
SCE&G - Distribution
No
NCL
SCE&G Gas
No
UAF
123,750
1,113,750
1,237,500
-1,237,500
Spirit Communications
No
UAF
TWC/Spectrum (Now Charter)
No
UAF
577,500
577,500
-577,500
4,477,550
4,890,050
9,367,600
-9,367,600
Page 98
January 2021
293 - Bull St. and Elmwood Ave. Intersection
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
AT&T-D
Charter/ TWC/ Spectrum
City of Columbia - Sewer
City of Columbia - Traffic Signal
City of Columbia - Water
SC State Government
SCE&G - Distribution
350,000
350,000
-350,000
SCE&G Gas
Spirit Communications
No
NCL
350,000
350,000
-350,000
327 - Candlewood Neighborhood Improvements
% CE Place Holder
7,630
7,630
-7,630
AT&T-D
No
NCL
Charter/ TWC/ Spectrum
No
NCL
City of Columbia - Water
No
NCF
Ni America (Palmetto of
Richland County)
No
UAF
SCE&G - Distribution
No
UAF
SCE&G Gas
No
UAF
7,630
7,630
-7,630
276 - Clemson Rd Widening
AT&T-D
No
NCL
10/15/17
02/01/18
Charter/ TWC/ Spectrum
No
NCL
12/02/16
03/01/18
04/01/18
City of Columbia - Traffic Signal
No
UAF
City of Columbia - Water
Yes
UAF
09/02/17
02/28/18
1,393,800
1,393,800
-1,393,800
NI America (Palmetto Utilities)
Yes
UAF
09/01/17
11/15/17
360,291
360,291
-360,291
Richland School District Two
No
NCL
03/28/17
06/01/17
07/01/17
SCE&G - Distribution
Yes
UAF
11/02/17
02/01/18
239,066
239,066
-239,066
SCE&G Gas
No
NCL
05/15/17
06/15/17
Spirit Communications
No
NCL
02/01/18
03/01/18
1,993,157
1,993,157
-1,993,157
295 - Clemson Rd. and Sparkleberry Ln. (to Mallet Hill Rd.) Intersection
% CE Place Holder
AT&T-D
No
NCL
City of Columbia - Water
No
NCL
345,000
345,000
-345,000
East Richland County Public
Servce District (ERCPSD)
No
NCL
SCDOT - Fiber
No
NCL
SCE&G - Distribution
No
NCL
SCE&G - Transmission
No
UAF
150,000
150,000
-150,000
SCE&G Gas
No
NCL
TWC/Spectrum (Now Charter)
No
NCL
99 | P a g e
* Form Types: NCL = No Cost Letter, NCF = No Conflict Letter, UAF = Utility Agreement Form, EF = Encroachment Form
MONTHLY PROGRESS REPORT
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
495,000
495,000
-495,000
326 - Decker Blvd/Woodfield Park Neighborhood Improvements
% CE Place Holder
1,105,061
1,105,061
-1,105,061
AT&T-D
Charter/ TWC/ Spectrum
City of Columbia - Sewer
City of Columbia - Water
East Richland County Public
Servce District (ERCPSD)
Richland School District Two
SCDOT - Traffic Signal
SCE&G - Distribution
SCE&G Gas
1,105,061
1,105,061
-1,105,061
747 - Dirt Road Paving Package "I"
% CE Place Holder
AT&T-D
Charter/ TWC/ Spectrum
East Richland County Public
Servce District (ERCPSD)
Level 3/ CenturyLink
MCI
Mid-Carolina Electric
Cooperative
Richland County Utilities - Sewer
SCE&G - Distribution
SCE&G Gas
297 - Garners Ferry Rd. and Harmon Rd. Intersection
% CE Place Holder
% CE Place Holder
42,950
42,950
-42,950
AT&T-D
CenturyLink
Charter/ TWC/ Spectrum
City of Columbia - Sewer
City of Columbia - Water
Level 3/ CenturyLink
NCF
SCE&G - Distribution
UAF
11,629
11,629
11,629
SCE&G Gas
Spirit Communications
42,950
42,950
11,629
11,629
-31,321
Page 100
January 2021
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Name
Prior Rights
*Form Type
To
Utility
Final
Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
Variance
164 - Harrison Road Sidewalk (Two Notch Rd. to Forest Dr.)
% CE Place Holder
107,935
107,935
-107,935
AT&T-D
NCL
AT&T-D
No
UAF
Charter/ TWC/ Spectrum
No
NCL
02/14/18
City of Columbia - Sewer
No
NCL
City of Columbia - Water
No
NCL
SCE&G - Distribution
Yes
UAF
155,210
155,210
155,210
SCE&G Gas
No
NCL
107,935
107,935
155,210
155,210
47,275
321 - Innovista Transportation Related Projects 2 - Greene Street Phase 2
AT&T-D
No
UAF
40,000
40,000
-40,000
Charter/ TWC/ Spectrum
No
NCL
40,000
40,000
-40,000
City of Columbia - Traffic Signal
Yes
UAF
350,000
350,000
-350,000
City of Columbia - Water
No
UAF
150,000
150,000
-150,000
Level 3/ CenturyLink
No
NCL
40,000
40,000
-40,000
MCI
Yes
NCF
SCE&G - Distribution
No
UAF
700,000
700,000
811,327
811,327
111,327
SCE&G Gas
No
NCL
Spirit Communications
No
NCL
40,000
40,000
-40,000
Street Lighting
Yes
UAF
150,000
150,000
-150,000
University of South Carolina
No
UAF
60,000
60,000
-60,000
1,570,000
1,570,000
811,327
811,327
-758,673
279 - Lower Richland Blvd Widening
% CE Place Holder
300,000
300,000
-300,000
City of Columbia - Water
No
NCL
SCE&G - Distribution
No
NCL
300,000
300,000
-300,000
280 - North Main Street Widening
AT&T-D
No
NCL
01/25/16
03/20/17
08/15/17
City of Columbia - Traffic Signal
No
NCL
07/01/17
11/30/18
3,151,061
3,151,061
-3,151,061
City of Columbia - Water
No
NCL
04/11/17
04/25/19
5,784,706
5,784,706
-5,784,706
DukeNet (Time Warner Cable)
No
NCL
02/01/17
06/01/17
Level 3/ CenturyLink
No
NCL
06/01/17
11/30/18
1,050,354
1,050,354
-1,050,354
SCE&G - Distribution
No
NCL
07/01/16
08/15/17
8,268,929
8,268,929
-8,268,929
SCE&G - Transmission
Yes
NCF
SCE&G Gas
No
NCL
02/11/16
05/15/17
08/15/17
Street Lighting
No
UAF
02/16/18
09/18/19
3,137,003
3,137,003
-3,137,003
TWC/Spectrum (Now Charter)
No
NCL
06/15/17
11/30/18
1,050,354
1,050,354
-1,050,354
16,657,701
5,784,706
22,442,407
-
22,442,407
101 | P a g e
* Form Types: NCL = No Cost Letter, NCF = No Conflict Letter, UAF = Utility Agreement Form, EF = Encroachment Form
MONTHLY PROGRESS REPORT
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
301 - North Springs Rd. and Harrington Rd. Intersection
% CE Place Holder
48,920
48,920
-48,920
AT&T-D
Charter/ TWC/ Spectrum
City of Columbia - Water
NI America (Palmetto Utilities)
Richland School District Two
NCF
SCE&G - Distribution
SCE&G Gas
48,920
48,920
-48,920
178 - Percival Road Sidewalk (Forest Dr to Northshore Rd, previously Decker Blvd)
% CE Place Holder
220,680
220,680
-220,680
AT&T-D
No
UAF
City of Columbia - Sewer
No
UAF
City of Columbia - Water
No
UAF
Richland County Utilities - Sewer
No
NCL
SCE&G - Distribution
No
UAF
SCE&G Gas
No
UAF
Spirit Communications
No
NCL
TWC/Spectrum (Now Charter)
No
NCL
220,680
220,680
-220,680
281 - Pineview Rd Improvements
AT&T-D
No
NCL
AT&T-T
No
NCL
CenturyLink
No
NCF
Charter/ TWC/ Spectrum
No
NCL
City of Columbia - Sewer
114,669
114,669
229,338
-229,338
City of Columbia - Water
Yes
UAF
1,780,447
1,780,447
3,560,895
-3,560,895
Level 3/ CenturyLink
No
NCL
MCI
No
NCL
SCE&G - Distribution
Yes
UAF
2,550,000
2,550,000
-2,550,000
SCE&G - Transmission
Yes
UAF
SCE&G Gas
No
NCL
Spirit Communications
No
NCL
4,445,116
1,895,116
6,340,233
-6,340,233
180 - Polo Rd Sidewalk (Mallet Hill Rd to Alpine Rd)
% CE Place Holder
131,418
131,418
-131,418
AT&T-D
Yes
NCL
City of Columbia - Water
Yes
UAF
East Richland County Public
Servce District (ERCPSD)
NCF
Page 102
January 2021
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
Level 3/ CenturyLink
No
NCF
Richland School District Two
No
UAF
SCE&G - Distribution
Yes
UAF
8,556
8,556
8,556
SCE&G Gas
No
NCL
Spirit Communications
TWC/Spectrum (Now Charter)
No
NCL
131,418
131,418
8,556
8,556
-122,862
282 - Polo Rd Widening
% CE Place Holder
800,000
800,000
-800,000
AT&T-D
Yes
UAF
Charter/ TWC/ Spectrum
City of Columbia - Water
Yes
UAF
SCE&G - Distribution
Yes
UAF
800,000
800,000
-800,000
303 - Screaming Eagle Rd. and Percival Rd. Intersection
% CE Place Holder
115,903
115,903
-115,903
AT&T-D
No
NCL
SCE&G - Distribution
115,903
115,903
-115,903
283 - Shop Rd Widening
% CE Place Holder
AT&T-D
No
NCL
495,000
495,000
-495,000
AT&T-T
No
NCL
CenturyLink
No
NCL
Charter/ TWC/ Spectrum
City of Columbia - Sewer
1,045,000
1,045,000
2,090,000
-2,090,000
City of Columbia - Water
Yes
UAF
4,427,500
3,932,500
8,360,000
-8,360,000
East Richland County Public
Service District (ERCPSD)
No
UAF
Level 3/ CenturyLink
No
NCL
SC State Government
No
NCL
SCDOT - Fiber
Yes
UAF
SCE&G - Distribution
Yes
UAF
08/09/17
1,350,250
1,350,250
2,700,500
-2,700,500
SCE&G - Transmission
SCE&G Gas
No
NCL
515,650
1,749,000
2,264,650
-2,264,650
SCE&G Gas High Pressure
No
NCL
Spirit Communications
No
NCL
University of South Carolina
No
NCL
7,833,400
8,076,750
15,910,150
-15,910,150
290 - Shop Road Extension Phase 1
AT&T-D
No
NCL
07/24/15
02/01/16
03/01/16
103 | P a g e
* Form Types: NCL = No Cost Letter, NCF = No Conflict Letter, UAF = Utility Agreement Form, EF = Encroachment Form
MONTHLY PROGRESS REPORT
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
AT&T-D
No
NCL
08/27/15
08/27/15
12/28/16
02/15/17
City of Columbia - Water
Yes
UAF
02/15/17
05/31/17
212,654
281,890
494,544
-494,544
Level 3/ CenturyLink
No
NCL
01/25/17
02/15/17
SCE&G - Distribution
Yes
UAF
08/14/15
11/16/16
01/25/17
142,094
17,476
159,570
-159,570
SCE&G - Transmission
Yes
UAF
08/13/15
3,400
3,400
-3,400
SCE&G Gas
No
NCF
358,148
299,366
657,514
-657,514
324 - Shop Road Extension Phase 2
AT&T-D
CenturyLink
Charter/ TWC/ Spectrum
City of Columbia - Sewer
City of Columbia - Water
CSX Traffic Fiber
Dominion Carolina Gas
Transmission
Level 3/ CenturyLink
MCI
Richland County Utilities - Sewer
SCE&G - Distribution
SCE&G Gas
SCE&G Gas High Pressure
Spirit Communications
589 - Sidewalk Package "S6"
SCE&G - Distribution
Yes
UAF
6,015
6,015
-6,015
6,015
6,015
-6,015
318 - Southeast Richland Neighborhood Improvements
AT&T-D
No
UAF
CenturyLink
No
NCL
Charter/ TWC/ Spectrum
No
NCL
02/07/18
86,900
86,900
86,900
86,900
City of Columbia - Sewer
UAF
59,200
35,200
94,400
-94,400
City of Columbia - Sewer
NCL
City of Columbia - Water
No
UAF
1,650
1,650
3,300
-3,300
Level 3/ CenturyLink
No
UAF
Palmetto Net - Spirit
No
UAF
SCE&G - Distribution
Yes
UAF
06/23/17
144,480
48,160
192,640
-192,640
SCE&G - Transmission
No
UAF
SCE&G Gas
No
UAF
Spirit Communications
292,230
85,010
377,240
86,900
86,900
-290,340
Page 104
January 2021
Name
Prior Rights
*Form Type
Form/Letter Status
Relocation Status
Baseline Cost Estimate
Forecast/Actual Cost
Variance
To Utility
Final Form
Utility
Form to
County
Start
Complete
DOT
County
Utility
Total
DOT
County
Utility
Total
284 - Spears Creek Church Rd Widening
% CE Place Holder
2,400,000
2,400,000
3,225,000
3,225,000
825,000
AT&T-D
UAF
150,000
150,000
150,000
AT&T-D
Charter/ TWC/ Spectrum
City of Columbia - Traffic Signal
City of Columbia - Water
Fairfield/Truvista
Communications
MCI
NI America (Palmetto Utilities)
Richland School District Two
SCE&G - Distribution
SCE&G Gas
SCE&G Gas High Pressure
2,400,000
2,400,000
3,375,000
3,375,000
975,000
187 - Sunset Sidewalk (Elmhurst Road to River Drive)
% CE Place Holder
114,965
114,965
-114,965
AT&T-D
No
NCL
1,000
1,000
-1,000
City of Columbia - Sewer
No
NCL
City of Columbia - Water
No
NCL
85,000
85,000
-85,000
SCE&G - Distribution
No
NCL
15,000
15,000
-15,000
SCE&G Gas
No
NCL
25,000
25,000
-25,000
Spirit Communications
No
NCL
TWC/Spectrum (Now Charter)
No
NCL
114,965
126,000
240,965
-240,965
144 - Three Rivers Greenway Extension Ph. 1
% CE Place Holder
5,000
5,000
-5,000
City of Columbia - Sewer
Yes
NCF
City of Columbia - Water
Yes
NCF
Level 3/ CenturyLink
Yes
NCF
Santee Cooper - Transmission
Yes
UAF
SCE&G - Distribution
SCE&G - Transmission
Yes
NCF
5,000
5,000
-5,000
105 | P a g e
MONTHLY PROGRESS REPORT
CONSTRUCTION PROCUREMENT SUMMARY
Project Name
Project Type
Procurement
Advertisement
Date
Contractor
Contract Amount /
Estimate
Notice-to-
Proceed Date
Construction
Status
1
2014 Dirt Road Paving Package "A"
Dirt Road
13-Mar-2014
-
-
-
No Award
1
2014 Dirt Road Paving Package "B"
Dirt Road
31-Mar-2014
Lane Construction
1,066,720.61
10-Jun-2014
Complete
1
2014 Dirt Road Paving Package "C"
Dirt Road
1-May-2014
Eagle Construction
1,079,265.46
27-Jun-2014
Complete
1
2014 Dirt Road Paving Package "D"
Dirt Road
19-Jun-2014
Lane Construction
760,547.74
13-Aug-2014
Complete
2014 Dirt Road Paving Package "E"
Dirt Road
2-Oct-2014
C.R. Jackson, Inc.
494,521.47
22-Jan-2015
Complete
2014 Resurfacing Package "A"
Resurfacing
23-Oct-2014
Sloan Construction Company
966,171.65
23-Feb-2015
Complete
2014 Resurfacing Package "B"
Resurfacing
23-Oct-2014
Sloan Construction Company
1,204,393.90
12-Mar-2015
Complete
2014 Resurfacing Package "C"
Resurfacing
18-Dec-2014
Carolina Bridge Company, Inc.
1,182,876.63
1-Jun-2015
Complete
Innovista - Greene Street Ph 1
Special
18-Dec-2014
LAD Corp.
13,014,182.98
11-May-2015
Complete
Broad River Rd. and Rushmore Rd. Intersection
Intersection
8-May-2015
C.R. Jackson, Inc.
879,200.00
28-Sep-2015
Complete
Clemson Rd. and Rhame Rd./North Springs Rd.
Intersection
8-May-2015
C.R. Jackson, Inc.
2,660,860.00
28-Sep-2015
Complete
Farrow Rd. and Pisgah Church Rd. Intersection
Intersection
8-May-2015
C.R. Jackson, Inc.
1,469,740.00
28-Sep-2015
Complete
Kennerly Rd. and Coogler Rd./Steeple Ridge Rd.
Intersection
8-May-2015
C.R. Jackson, Inc.
1,971,536.50
28-Sep-2015
Complete
North Springs Rd. and Risdon Way Intersection
Intersection
8-May-2015
C.R. Jackson, Inc.
1,370,700.00
28-Sep-2015
Complete
Summit Pkwy and Summit Ridge Dr Intersection
Intersection
8-May-2015
C.R. Jackson, Inc.
1,049,104.94
28-Sep-2015
Complete
Lincoln Tunnel Greenway
Greenway
31-Jul-2015
AOS Specialty Contractors, Inc.
1,177,129.96
23-Nov-2015
Complete
2015 Dirt Road Paving Package "F" (Jouster St.)
Dirt Road
21-Oct-2015
Armstrong Contractors, LLC
127,504.15
21-Mar-2016
Complete
2015 Sidewalk Package "S1"
Sidewalk
23-Oct-2015
Armstrong Contractors, LLC
98,548.72
29-Feb-2016
Complete
2015 Sidewalk Package "S2"
Sidewalk
18-Nov-2015
CBD Inc.
148,257.31
28-Apr-2016
Complete
2016 Resurfacing Package "D"
Resurfacing
18-Nov-2015
-
-
-
No Award
2015 Sidewalk Package "S4"
Sidewalk
15-Dec-2015
Orion Construction Co.
69,797.69
2-May-2016
Complete
2016 Resurfacing Package "E"
Resurfacing
22-Jan-2016
-
-
-
No Award
2016 Resurfacing Package "F"
Resurfacing
22-Jan-2016
-
-
-
No Award
2016 Resurfacing Package "G"
Resurfacing
1-Mar-2016
-
-
-
No Award
2016 Resurfacing Package "H"
Resurfacing
1-Mar-2016
Lane Construction
$5,730,297.39
13-Oct-2016
Complete
2
Riverbanks Zoo Transportation-Related Projects 1
Special
-
Rodgers Builders, Inc.
2,976,495.00
-
Complete
3
Hardscrabble Road Widening
Widening
-
Palmetto Corp. of Conway, Inc.
29,860,800.00
-
Underway
North Main Street Widening
Widening
3-Jun-2016
-
-
-
No Award
Sidewalk Package "S5"
Sidewalk
19-Jul-2016
Armstrong Contractors, LLC
104,789.76
16-Jan-2017
Complete
Shop Road Extension Phase 1
Special
20-Jul-2016
McClam and Associates
25,963,674.40
12-Feb-2017
Complete
Bluff Road Widening Phase 1
Widening
8-Aug-2016
Cherokee, Inc.
5,594,406.93
5-Dec-2016
Complete
Sidewalk Package "S3"
Sidewalk
15-Aug-2016
Orion Construction Co.
252,931.80
30-Jan-2017
Complete
Page 106
January 2021
North Main Street Widening (re-advertise)
Widening
26-Sep-2016
L-J Incorporated
36,772,698.57
9-Feb-2017
Underway
Three Rivers Greenway
Greenway
13-Jan-2017
AOS Specialty Contractors, Inc.
$6,208,832.86
24-Jul-2017
Underway
Project Name
Project Type
Procurement
Advertisement
Date
Contractor
Contract Amount /
Estimate
Notice-to-
Proceed Date
Construction
Status
Resurfacing Package "I"
Resurfacing
8-Feb-2017
LCI-Lineberger Construction,
855,329.74
31-Jul-2017
Complete
Resurfacing Package "J"
Resurfacing
8-Feb-2017
LCI-Lineberger Construction,
452,081.83
31-Jul-2017
Complete
Resurfacing Package "K"
Resurfacing
8-Feb-2017
LCI-Lineberger Construction,
460,472.72
31-Jul-2017
Complete
Resurfacing Package "L"
Resurfacing
8-Feb-2017
-
-
-
No Award
Resurfacing Package "M"
Resurfacing
15-Feb-2017
C.R. Jackson, Inc.
2,758,180.42
24-Jul-2017
Complete
Transportation Improvement Contract 1
Multi
5-May-2017
Palmetto Corp. of Conway, Inc.
5,762,753.75
28-Aug-2017
Complete
Sidewalk Package "S7"
Sidewalk
13-Oct-2017
AOS Specialty Contractors, Inc.
179,688.91
15-Jun-2018
Complete
Resurfacing Package "N"
Resurfacing
14-Nov-2017
-
-
-
No Award
Candlewood Neighborhood Improvements Ph. 2
Neighborhood
15-Dec-2017
AOS Specialty Contractors, Inc.
403,880.48
15-Jun-2018
Complete
Pedestrian Intersection Improvements Projects
Ped Improvement
11-Apr-2018
-
-
-
No Award
Sidewalk Package "S6"
Sidewalk
11-Apr-2018
Armstrong Contractors, LLC
605,926.70
1-Oct-2018
Underway
Dirt Road Package "H"
Dirt Road
18-Apr-2018
McClam and Associates
897,491.25
1-Oct-2018
Underway
Dirt Road Package "G"
Dirt Road
19-Apr-2018
McClam and Associates
723,696.15
1-Oct-2018
Underway
Sidewalk Package "S8"
Sidewalk
9-May-2018
Corley Construction
102,040.62
1-Oct-2018
Complete
Resurfacing Package "O"
Resurfacing
11-May-2018
C.R. Jackson, Inc.
1,161,605.36
5-Sep-2018
Complete
Resurfacing Package "P"
Resurfacing
4-Jun-2018
Palmetto Corp. of Conway, Inc.
3,477,238.39
19-Nov-2018
Complete
Sidewalk Package "S9"
Sidewalk
1-Aug-2018
Orion Construction Co.
201,405.00
18-Mar-2019
Complete
Pedestrian Intersection Improvements (re-advertise)
Ped Improvement
29-Aug-2018
AOS Specialty Contractors, Inc.
697,886.48
15-Feb-2019
Complete
Candlewood Neighborhood Improvements Ph. 3
Neighborhood
17-Oct-2018
Corley Construction
$719,845.00
18-Mar-2019
Underway
Clemson Road Widening
Widening
5-Nov-2018
C.R. Jackson, Inc.
$10,265,200.30
28-Jan-2019
Underway
Broad River Neighborhood Improvements
Neighborhood
12-Dec-2018
Cherokee, Inc.
858,063.50
6-May-2019
Underway
Dirt Road Package "I"
Dirt Road
19-Dec-2018
R&T Grading, Inc.
952,811.84
1-May-2019
Complete
Southeast Richland Neighborhood Improvements
Neighborhood
18-Jan-2019
McClam and Associates
3,660,326.82
6-May-2019
Underway
Dirt Road Package "J"
Dirt Road
5-Mar-2019
Cherokee, Inc.
829,941.57
12-Aug-2019
Complete
Sidewalk Package "S11" (Harrison Rd and Polo Rd)
Sidewalk
16-Apr-2019
-
-
-
No Award
Resurfacing Package "Q"
Resurfacing
24-May-2019
Palmetto Corp. of Conway, Inc.
4,294,813.87
pending
Complete
North Springs Rd and Harrington Rd Intersection
Intersection
12-Jun-2019
Palmetto Corp. of Conway, Inc.
960,931.00
pending
Complete
Greene Street Phase II
Special
7-Aug-2019
Crowder Construction Company
16,046,190.35
pending
Underway
Polo Rd Sidewalk (Mallet Hill Rd to Alpine Rd)
Sidewalk
tentative
pending
3,000,000.00
pending
Underway
107 | P a g e
MONTHLY PROGRESS REPORT
4
Harrison Road Sidewalk (Two Notch to Forest Dr.)
Sidewalk
tentative
pending
2,000,000.00
pending
Underway
4
Garners Ferry Rd. and Harmon Rd. Intersection
Intersection
tentative
pending
700,000.00
pending
pending
4
Screaming Eagle Rd. and Percival Rd. Intersection
Intersection
tentative
pending
2,000,000.00
pending
pending
Project Name
Project Type
Procurement
Advertisement
Contractor
Contract Amount /
Estimate
Notice-to-
Proceed Date
Construction
Status
4
Clemson Rd Sidewalk (Longtown Rd to Two Notch)
Sidewalk
tentative
pending
250,000.00
pending
pending
4
Atlas Rd Widening
Widening
tentative
pending
25,000,000.00
pending
pending
4
Blythewood Rd Widening (Syrup Mill Road to I-77)
Widening
tentative
pending
8,000,000.00
pending
pending
4,5
Dirt Road Paving Package “K” (4 roads)
Dirt Road
tentative
pending
2,000,000.00
pending
pending
4,5
Resurfacing Package "R" (45 roads)
Resurfacing
tentative
pending
5,100,000.00
pending
pending
4
Decker/Woodfield Neighborhood - Faraway
Neighborhood
tentative
pending
400,000.00
pending
pending
Total Contract To-Date
250,033,788.47
Page 108
January 2021
1
Project procured by Richland County.
2
Project procured and managed by Riverbanks Zoo. Value in Contract Amount column is Richland Penny funding commitment to-date.
3
Project procured and managed by South Carolina Department of Transportation (SCDOT). Value in Contract Amount column is Richland Penny funding commitment to-date.
4
Projects prepared for advertisement prior to November 2019 have been included and shown as tentative awaiting County staff and/or County Council decision to advertise.
5
The number of roads in this Package are tentative. Estimated cost pending final package determination.